Unpacking The Bridge Unit; Minimum Workers - Epson WF-C20590 Installation Manual

Hide thumbs Also See for WF-C20590:
Table of Contents

Advertisement

WF-C20590 Installation Guide

Unpacking the Bridge Unit

 Items needed
 Phillips screwdriver
 Flathead screwdriver
 Minimum workers
 3 people
Be sure to check the following notes before unpacking:
 All workers must read the unpacking procedure together
before starting work.
 Wear easy-to-move clothing, gloves, and safety shoes.
 Work with care to avoid injuries.
 Work with sufficient working space.
 Never work with less than 3 people.
 Use proper lifting techniques, and stop working
immediately if you feel that the load is too bulky or heavy.
UNPACKING PROCEDURE
1.
Pull up on the end of each plastic band to remove them.
PRELIMINARY
Unpacking
x2
Plastic bands
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents