Commissioning - Mira Sport 7.5 Installation Manual

7.5, 9.0 & 9.8 kw
Hide thumbs Also See for Mira Sport 7.5:
Table of Contents

Advertisement

Before carrying out the commissioning procedure install the Shower Fittings,
refer to the Shower Fittings Installation and User Guide.
If you are unsure how an electric shower works, please read through the User
Instructions section before continuing.
1.
Electrical supply is turned
off at the mains.
4.
Check for water leaks.
7.
Push START button.
10.
Turn control to full cold.

COMMISSIONING

2.
Turn control to full cold.
5.
Set control to LOW.
8.
0 - 5 secs
Water will be at full force and
at a cool temperature.
11.
Set control to MEDIUM.
13
3.
Turn water supply fully
on.
6.
S w i t c h o n e l e c t r i c a l
supply.
9.
Tu r n c o n t r o l s l o w l y.
Temperature remains cool
and flow is reduced.
12.
5 - 10 secs
The temperature will rise
slightly.
+
_