P. 02 P. 11 Detaching the mounting bracket (Hanger Arm) from the unit. TEST RUNNING 1. Detached the side panel from both side of the unit. RUN TEST: * Check electrical main wire “ voltage”. * Run the air conditioner for 15 minutes or more. Check the electrical current with ammeter and compare with the specification.
P. 10 P. 03 ELECTRICAL WIRE DIAGRAM 6. Mount the hanger arm into the anchor bolt with washer, spring washer and nut. * Wiring as shown in electrical wiring diagram. * Use copper conduction only. * How to tighten screw on terminal block. 1.Bare the ends of electric wire.
P. 04 P. 09 AIR PURGING AND CHECK OF PIPE LEAKAGE LOCATION FOR INDOOR UNIT Select the location the indoor unit with the following consideration: The purpose of air purging is to get rid of -- Use hexagonal wrench to open both 1.The front of the air injet and outlet shall be free from any obstration.
P. 08 P. 05 REFRIGERANT PIPING WORK LIQUID PIPE AND DRAIN PIPE 1. Selection of copper pipe for gas pipe and liquid pipe as informed in specific table(see pipe table) 2. For dust moisture protection , before assembly the pipe and its insulation, both end of the pipe * Drain pipe should be above ground must be coverage.
P. 06 P. 07 PIPE PREPARATION • Drain hose outlet from indoor unit can be manage in 3 style ::rear ,left and right of the indoor unit • Tighten both fare nuts into gas pipe and liquid pipe at the indoor unit with two holding spanners. Right Wrong -PIPE &...