Location For Indoor Unit - Rheem SMUL 12 Installation Instruction

Floor/ceiling indoor unit
Table of Contents

Advertisement

LOCATION FOR INDOOR UNIT

Select the location the indoor unit with the following consideration:
1.The front of the air injet and outlet shall be free from any obstration. The outlet air
should flow out freely.
2. The wall where the unit is to be mounted should be stiff enough not to resonant
and produce noise.
3. The place should allow easy access to install the copper tube pipe to the outdoor.
4. Ensure the clearance on every side of the indoor unit to conform to figure below.
5. From the floor the height should be more than the eye level.
CAUTION : Avoid installing the unit form direct sunlight.
P. 04
AIR PURGING AND CHECK OF PIPE LEAKAGE
The purpose of air purging is to get rid of
moisture and air in the system, other wise
moisture and air may cause and
ineffectiveness of compressor which directly
effects to the cool air.
PURGING BY USING VACUUM:
After tighten flare nut between indoor and
Outdoor unit.
Remove the blank cap of three-way
Valve by using torque wrench .Check
Both high pressure and low-pressure
Valve are in closed condition.
Remove the nut of the service port.
Connect gauge into the service port.
Connect gauge into the vacuum pump
Vacuum until gauge indicate at 30-
Inch mercury pressure.
Remove gauge. Tighten up the nut of
service port.
GAS LEAKING CHECK:
-- Check leakage by apply soapsuds to
Ever connection and inspect carefully
after checking wipe them off completely.
P. 09
-- Use hexagonal wrench to open both
high pressures, low –pressure valve to
the end (counter clockwise).
Tighten the blank cap of three-way
Valve.
--
Cover indoor unit joint with pipe
insulation and 4 plastic bands prevent
Condensation at joint.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smul 24Smul 18Smul 30Smul 36Smul 48Smul 60

Table of Contents