Operation - Central Machinery 92804 Assembly And Operating Instructions Manual

Air concrete vibrator
Table of Contents

Advertisement

WARNING! This Concrete Vibrator produces significant torque and vibration.
The elderly, infirm, and pregnant women should not use this device.
WARNING! THE BASE UNIT OF THE CONCRETE VIBRATOR MUST BE SECURELY
STRAPPED DOWN BEFORE USE.
WARNING: Only use the Concrete Vibrator to vibrate and smooth wet concrete. Do
not use it on hard surfaces or you will damage the unit or cause personal injury.
Connecting the Vibrating Head to the Base Unit
1.
Insert the Rod on the center of the Cylindrical Connector (A16) into the center hole in
the end of the Base Unit. Align the notches on the bottom of the Cylindrical Connector
(A16) with the handle on the Base Unit. Turn the Handle to lock the Cylindrical Con-
nector (A16) into place. See FIGURE 1.
Cylindrical Connector (A16)
Operating the Unit
2.
After making sure the Base Unit is strapped securely in place using the metal
Support Bracket (20) surrounding it, attach the air hose source and turn on the air
compressor. We recommend having a second person to adjust the Regulator (21) for
power. DO NOT LET GO OF THE CONCRETE VIBRATOR TUBE HEAD WHEN THE
UNIT IS ON. To adjust the Regulator (21), loosen the Lock Nut and adjust the air flow
using the Knob. After achieving the correct air flow, use a wrench to gently tighten the
lock nut. See FIGURE 2.
FIGURE 2
Support Bracket (20) of
Base Unit
SKU 92804
Refer to cover photo and the assembly diagrams.
FIGURE 1
Knob
Lock Nut
For technical questions, please call 1-800-444-3353

Operation

Rod
Notches
Base Unit
Handle
Regulator (21)
Air Inlet
Page 5

Advertisement

Table of Contents
loading

Table of Contents