Craftsman 247.240800 Operator's Manual page 28

Three bin bagger
Table of Contents

Advertisement

Available languages

Available languages

MONTAJE E INSTALACIÓN
7.
With the bagger cover open, insert the upper chute tube into the discharge
chute then pivot the upper chute tube into position so that the chute rests in
the upper chute support. See Figure 46.
Note: Make sure to align the upper chute with the ridges on the upper chute
support.
Figure 46
28

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents