Transport, storage and packing
Fig. 8
Positioning the square timbers and setting
down the vacuum circuit-breaker
10
•
Set the vacuum circuit-breaker down onto the square timbers.
•
Hang further sling gear into the transport boreholes.
•
Transport to installation site or leave suspended from crane for further
work steps.
Note
Keep partitions and accessory pack ready for the installation.
Fig. 9
Transporting without pallet
9229 9992 176 0D
2013-07-08