Before Installation, Re-Installation Or Troubleshooting; Before Start-Up; During Operation; Misc - Linak CBH Advanced User Manual

Table of Contents

Advertisement

Before installation, re-installation, or troubleshooting:
• Stop the actuators
• Pull out the mains plug.
• Relieve the actuators of any loads, which may be released during the work.

Before start-up:

• Make sure that the system has been installed as instructed in this User Manual.
• Make sure that the voltage of the control box/SMPS is correct before the system is
connected to the mains.
• System connection. The individual parts must be connected before the control box
/SMPS is connected to the mains. See the User Manual for LINAK actuators, if
necessary.

During operation

• If the control box makes unusual noise or smells, switch off the mains voltage
immediately.
• Take care that the cables are not damaged.
• The products must only be used in an environment, that corresponds to their IP
protection.

Misc.

The actuator system has a sound level below 70dB(A) in typical applications.
Updated manuals and declarations can always be found here:
www.linak.com/homeline
Page 7 of 32

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CBH Advanced and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Cbh1200b

Table of Contents

Save PDF