Summary of Contents for HTP Superstor Ultra SSU CB Series
Page 1
Superstor Ultra Stainless Steel Storage Tanks Installation Start-Up Maintenance Parts Warranty For Residential and Commercial Use SSU CB Models This manual must only be used by a qualified installer / service technician. Read all instructions in this manual before installing. Perform steps in the given order.
AHJ. must have room for service: 24” front and 6” sides are minimum NOTE: HTP reserves the right to modify product technical specifications recommended service clearances. (A combustible door or removable and components without prior notice.
A. Locating the Storage Tank This storage tank is certified for indoor use only. DO NOT INSTALL NOTE: If the storage tank is exposed to the following, do not OUTDOORS. Outdoor installations ARE NOT covered by warranty. operate. Immediately call a qualified service technician. Choose a location for the storage tank as centralized to the piping 1.
removing it from the space. • If the pH is not between 6.5 and 8.5, consult a local water NOTE: A combustible door or removable panel is acceptable front treatment company for solutions. clearance. Hardness less than 12 grains (200 mg/L) •...
D. Temperature and Pressure Relief Valve On all models, an appropriate temperature and pressure (T&P) valve FAILURE TO RE-INSPECT THE T&P VALVE AS DIRECTED COULD must be supplied and installed as detailed in the piping diagrams in RESULT IN UNSAFE TEMPERATURE AND/OR PRESSURE BUILD- this installation manual.
G. Applications SSU-80CB / SSU-119CB Figure 3 - Typical Storage Tank Installation - SSU-20CB - SSU-60CB Models Figure 4 - Typical Storage Tank Installation - SSU-80CB and SSU-119CB Models PIPING NOTES: The following notes are applicable to all of the piping applications demonstrated on this page. 1.
demand applications (spas, hot tubs, whirlpools). 6. When the system is completely flushed, purged of air, and the temperature is set, turn on the water heating system. Observe operation. Ensure the boiler shuts down after the storage tank set point is satisfied. Part 6 - Maintenance and Troubleshooting Periodic maintenance should be performed by a qualified service technician to ensure all equipment is operating safely and efficiently.
Page 9
Troubleshooting No Hot Water Not Enough Hot Water Problem Possible Solution Problem Possible Solution Zone valve not opening Open manually to replace Zone valve restriction 1” full bore replace zone valve Circulator not operating Check or replace Circulator arrow reversed Reverse circulator Tank control set too low Raise tank temperature*...
6. Use the storage tank at water pressures not exceeding the working pressure shown on the rating plate. HTP warrants each coil booster stainless steel storage tank to be free 7. Keep the storage tank free of damaging scale deposits.
Page 11
Supervisor approval. During the claims process a product that must be replaced will be given a designation of either a) field scrap, or b) return to HTP. If the product must be returned to HTP, the returned product must arrive at HTP within thirty (30) days of the date of our request to return the product.
Customer Installation Record Form The following form should be completed by the qualified installer / service technician for you to keep as a record of the installation in case of a warranty claim. After reading the important notes at the bottom of the page, please also sign this document. Customer’s Name Date of Installation Installation Address...
Need help?
Do you have a question about the Superstor Ultra SSU CB Series and is the answer not in the manual?
Questions and answers