5. Entering into the Web Management
Default IP Address: 192.168.1.253
Default Password: admin
Default SSID: PLANET _2.4G or PLANET _5G
Step 1: Launch the Web browser and enter the default IP address
http://192.168.1.253
Step 2: The default password is "admin". Then click the LOGIN
button to continue.
For security reasons, it is recommended to change the password at the
first login and memorize it..
Step 3: For security reasons, it is strongly recommended to go to
Advanced to configure the Encryption Method and Passphrase
of your wireless network.
Step 1: Launch the Web browser (Google Chrome is recommended)
and enter the default IP address https://192.168.1.100:8888
of the SAPC. Then, enter the default username and password
"admin" to log on to the system.
* The secure login with SSL (HTTPS) prefix is required.
Step 2: Go to the "Search" page to discover and add the managed AP
to the device list. Then, you can go to the "Control-> AP
Management" page to configure pre-defined profiles to the
managed AP without logging on to the AP's web page.
For information about further configuration of Managed AP by using
PLANET Smart AP Control, refer to the configuration guide of the SAPC.
– 5 –
– 7 –
6. Easy to Set Up PtP WDS Connection
Step 1: (1) Position "S" to "M" on the master AP. Stay in "S" on the
slave AP.
(2) Press the "Reset/Pair" button within 2 minutes on both
sides.
(3) The connection will be established easily.
3-Step to Set Up PtP WDS
WDS
S
M
WDS
S
M
WDS
S
M
Position "S" to "M" on master AP
Press Reset within 2 mins
Step 1
7. AP Discovery through
PLANET Smart AP Control (SAPC)
The WBS-202N and the WBS-502N are the Smart AP series which can
be centrally managed by PLANET WLAN Controller.
Follow the steps below to discover the managed AP through PLANET
Smart AP Control (SAPC). Please ensure each managed AP uses a
different static IP in the same subnet before physically connecting to
the managed network.
*** Please regularly check PLANET website for the latest compatible list
of the controller/managed APs in each firmware version.

Further Information

The above steps introduce the simple installations and configurations of
the device. For further configurations, please refer to the user manual,
which can be downloaded from the website.
WBS-202N/WBS-502N:
http://www.planet.com.tw/en/support/downloads?metho
d=category&c1=wireless-lan&p=&type=3
PLANET Management Hardware WLAN Controller
(WAPC-500/WAPC-1000):
http://www.planet.com.tw/en/support/downloads?metho
d=category&c1=wireless-lan&p=&type=3
PLANET Management Software WLAN Controller
(Smart AP Control):
http://www.planet.com.tw/storage/products/48976/Smar
t%20AP%20Control%20-%20Configuration%20Guide_v1
.0.pdf
If you have further questions, please contact the local dealer or
distributor where you purchased this product.
PLANET Technology Corp.
10F., No 96, Minquan Rd., Xindian Dist.,
New Taipei City 231, Taiwan
Connecting
WDS
S
M
Connected
Step 2
Step 3
– 6 –
2011-E10730-000
– 8 –

Advertisement

loading
Need help?

Need help?

Do you have a question about the WBS-202N and is the answer not in the manual?

This manual is also suitable for:

Wbs-502n