QUICK START GUIDE
Of�ice Pro 60 & Of�ice Pro 63
Refer to the operation manual and pay attention to all the warnings and cautions throughout the manual
Typical Installation Options
CONDITION TO USE OPTION 1
No negative air pressure** in the room
and the temperature of the infiltrated
air is below the room temperature.
Opera ng temperature Range:
Between
65 °F (18 °C) to 105 °F (41 °C)
Ceiling Tile
(with 16" hole)
Flexible Duct
Kit (16" Dia)
Accessory
Part Number
Name*
Ceiling Tile
GX484410-8940
1
Flexible Duct
LAY45820-0010
1
Kit
*Accessories Sold Separately
NOTE: Ensure that the warm air moves away from the ceiling and the heat is dissipated.
If your application does not meet this requirement, then extend the duct to the nearest
exhaust point based on the Maximum Equivalent Length listed in the operation manual.
**
-
MovinCool unit is installed and runs using OPTION 1.
-
Door to the room is closed.
-
No other source of air entering the room.
• Removal of original ceiling tile:
Remove the original selected ceiling tile from the ceiling (if the tile is 2' x 4', then cut
the tile into 2' x 2' and place one piece back into the ceiling at the end).
• Installation of the ceiling tile with the duct:
Place the ceiling tile (with the duct) inside the ceiling.
• Warm air flexible duct attachment to the unit:
1) Place the duct over the flange on the top of the unit as shown in the figure below.
2) Secure the duct to the flange with clamp included with the ceiling tile (with 16" hole).
C) OPTION 2 set up steps
• Condenser Air Plenum Installation:
CONDITION TO USE OPTION 2
Negative air pressure** in the room.
Opera ng temperature Range:
Between
65 °F (18 °C) to 105 °F (41 °C)
Ceiling Tile
(with 16" hole)
Flexible Duct
Kit (16" Dia)
Accessory
Part Number
Name*
GX484410-8940
Ceiling Tile
Flexible Duct
LAY45820-0010
Kit
Condenser Air
LAY84270-0060
Plenum
1) Open the condenser door, remove the filter
and set it aside.
2) Remove the six (6) screws that attach the
filter door hinge to the condenser side panel.
Remove the door hinges from the unit (save the
screws and the filter for later use).
1
NOTE: Refer to the operation manual for details on choosing the installation site
A) Roll the unit into the space that needs cooling
• Moving the unit:
Unlock the casters and push the MovinCool unit using the handle to a flat, level
surface and set the casters back to the LOCKED position.
Handle
Condenser
Air
Plenum
Unlocked
Locked
B) OPTION 1 set up steps
1
• Warm air flexible duct attachment to the ceiling tile:
1) Slide one end of the flexible duct to the ceiling tile flange as shown in the figure
1
below.
1
2) Secure the flexible duct to the ceiling tile flange with the clamp included with the
ceiling tile.
3
3) Install the filter from the condenser side panel onto
the condenser plenum.
4) Insert bottom flange of the condenser plenum
between side panel and three inner tabs.
2
5)
Snap upper tabs of the plenum into place on
the side panel.
6)
Use the screws provided in the kit to secure the
Air Plenum to the unit.
2
4
.
NEXT PAGE
NEXT PAGE
Need help?
Do you have a question about the Office Pro 60 and is the answer not in the manual?
Questions and answers