Unit Installation
Figure 1
15.0
32.0
580.0 ~ 610.0mm (CEILING OPENING MEASUREMENT)
Unit Hanging
570.0 (UNIT SIZE)
Drain Piping Work
Fan Coil Unit
Pipe Clamp
Good
Drain Test
Feed Water
Flexible Drain Hose
NOTE
This fan coil unit uses a drain pump for condensed water drainage. Install the unit horizontally to prevent water
leakage or condensation around the air outlet.
538.0
18.0
529.0
19.0
Bad
Main Drain Pipe
• Measure and mark the position for the hanging rod. Drill
the hole for the angle nut on the ceiling and fix the
hanging rod.
• The installation template is extended according to
temperature and humidity. Check on dimensions in use.
• The dimensions of the installation template are the same
as those of the ceiling opening dimensions.
• Before ceiling laminating work is completed, be sure to
fit the installation template to the fan coil unit.
NOTE
Be sure to discuss the ceiling drilling work with the
installers concerned.
• Confirm the pitch of the hanging rod as per Figure 1.
• Hold the unit and hang it on the hanging rod with the nut
and washer.
• Adjust the unit height to 30.0 mm between the fan coil
unit bottom surface and the ceiling surface.
• Confirm with a level gauge that the unit is installed
horizontally and tighten the nut and bolt to prevent unit
falling and vibration.
• Open the ceiling board along the outer edge of the paper
installation template.
• Drain pipe must be in downward gradient for smooth
drainage.
• Avoid installing the drain pipe in up and down slope to
prevent reversed water flow.
• During the drain pipe connection, be careful not to exert
extra force on the drain connector at fan coil unit.
• The outside diameter of the drain connection at the
flexible drain hose is 20 mm.
• Be sure to execute heat insulation (polyethylene foam
with thickness more than 8.0 mm) on the drain piping to
avoid the condensed water dripping inside the room.
• Connect the main drain pipe to the flexible drain hose.
• Feed water from flexible drain hose to check the piping
for leakage.
• When the test is completed, connect the flexible drain
hose to the drain connector on the fan coil unit.