Table Of Contents; General Information - New Yorker CLW Series Installation, Operating And Service Instructions

Cast iron oil-fired boiler
Table of Contents

Advertisement

B
e
o f
e r
s
a t
t r
n i
g
o t
n i
e l
g
b i
e l
c
o
n
d
t i
o i
n
a
n

TABLE OF CONTENTS

I.

General Information .............................. 3

II.
Installation Instructions ......................... 6
III.
A.
INSPECT SHIPMENT carefully for any signs of
damage.
1. ALL EQUIPMENT is carefully manufactured,
inspected and packed. Our responsibility ceases
upon delivery of crated boiler to the carrier in good
condition.
2. ANY CLAIMS for damage or shortage in shipment
must be filed immediately against the carrier by the
consignee. No claims for variances from, or
shortage in orders, will be allowed by the
manufacturer unless presented within sixty (60) days
after receipt of goods.
B.
LOCATE BOILER in front of final position before
removing crate. See Figures 1A and 1B.
1. LOCATE so that smoke pipe connection to
chimney will be short and direct. BOILER IS
SUITABLE FOR INSTALLATION ON
COMBUSTIBLE FLOOR. Boiler cannot be
installed on carpeting.
s
a t
l l
h t
s i
o
l i
b
i o
e l
, r
e r
d
p
o
s
e t
d
n
e
r a
o
l i
b
o
SECTION I: GENERAL INFORMATION
I
M
P
O
R
T
A
N
T
a
d
h t
e
s
e
n i
t s
u r
t c
o i
l i
r e
o f
r
e r
e f
e r
n
c
e
b
y
IV.
V.
2. FOR BASEMENT INSTALLATION, provide a
solid base, such as concrete, if floor is not level, or
if water may be encountered on floor around boiler.
3. PROVIDE SERVICE CLEARANCE of at least 24"
on right side of boiler for cleaning flueways and for
removal of rear tankless heater. Provide at least 24"
clearance from front jacket panel for servicing.
4. For minimum clearances to combustible materials.
See Figure 2.
C.
PROVIDE AIR SUPPLY AND VENTILATION to
accommodate proper combustion. If natural ventilation
is inadequate, provide a screened opening or duct from
the boiler room to the outside. The opening or duct
must be sized so the boiler input will not exceed 4,000
BTUH/Sq. In. of free area. If other air consuming
appliances are near the boiler, the air inlet should be
larger. Consult respective manufacturers.
3
n
s
c
a
e r
u f
l l
. y
K
e
e
p
n i
o
w
n
r e
a
n
d
s
e
v r
c i
e
e t
Boiler Cleaning ................................... 19
Repair Parts ......................................... 20
Burner Specifications .......................... 14
t s
u r
t c
o i
n
s
n i
c
h
n
c i
a i
. n

Advertisement

Table of Contents
loading

This manual is also suitable for:

Clw-3Clw-6Clw-4Clw-5

Table of Contents