600 A T-OP II™ terminator operation instructions
Using the hotstick, insert the O&T/Torque tool into the
●
●
throat of the 200 A bushing portion at the LRTP . Engage
the rotating nut. (Refer to Figure 7 .)
Turn the O&T/Torque tool counterclockwise until both the
●
●
threaded connection and the interference fit of the T-OP
II is broken.
Figure 7 . Installing the O&T/Torque tool into one LRTP
N
otee:
The initial disconnect of the T-OP II may be difficult
until the installation torque is overcome.
Using the hotstick, lift the T-OP II termination off the
●
●
apparatus bushing and place it on the insulated standoff
bushing. (Refer to Figure 8.)
While pushing the T-body onto the standoff bushing, turn
●
●
the O&T/Torque tool clockwise to make the threaded
connection, turn until tight.
Remove O&T/Torque tool.
●
●
Figure 8 . Move T-OP II Terminator to insulated bushing
3
Operation Instructions
MN650047EN May 2017
Step 4
Provide a visible ground
After securing cable end of grounding elbow to the
●
●
system ground, firmly grasp the pulling eye of the elbow
with the hotstick.
Close the grounding elbow into the 200 A bushing of the
●
●
LRTP . (Refer to Figure 9.)
Attach drain wire of 600 A T-OP II protective cap to
●
●
system ground.
Clean and lubricate mating interface of cap.
●
●
Figure 9 . Install the grounding elbow into the
200 A bushing
Grasp pulling eye of cap with hotstick and pull fully into
●
●
the stick.
Using the shotgun, install protective cap on to the
●
●
exposed apparatus bushing by threading the cap on to
the bushing stud.
Turn until tight and remove hotstick.
●
●
Repeat this procedure on both ends, for each cable to
●
●
be grounded. (Refer to Figure 10.
Figure 10 . Install protective cap on exposed
apparatus bushing