Download Print this page

OLT 6x6 Maximizer Assembly Manual page 6

Storage shed
Hide thumbs Also See for 6x6 Maximizer:

Advertisement

6.
Attach Floor Runners to completed floor
frame. There are 3 floor runners per 70" side.
Use 8 - 2 1/2" screws per Runner.
8.
Complete all Floor Runners.
Foundations
Note: The floor will be flipped over and floor
runners will sit on your foundation. It is
important to note that having a level
foundation is critical. Choosing a foundation will
vary between regions. Typical foundations can
be concrete pads or patio stones positioned
underneath the floor runners.
10.
Position Plywood Floor pieces (2) on top of completed floor frames. The Plywood is cut slightly
smaller than floor framing. Keep plywood seams tight.
1-888-658-1658
7.
front and rear floor framing but not overhanging.
Concrete Slab
Floor Runners
Foundation
evenly spaced.
9.
floor over and place on your foundation.
Caution- you will need 2 people to assist you. Be
careful when laying floor down not to bend or twist
floor. When in place, level floor completely.
www.outdoorlivingtoday.com
Page 6
Make sure Runners are flush with outside and
With Floor Runners attached, carefully flip the
sales@outdoorlivingtoday.com

Advertisement

loading