Download Print this page

OLT 6x6 Maximizer Assembly Manual page 18

Storage shed
Hide thumbs Also See for 6x6 Maximizer:

Advertisement

38.
Place 2nd completed Rafter Section on gable wall framing. Position as per Steps 34 - 36.
Gable Notch
39.
With Ridge Board locked into gable notch, align Ridge Boards so they are flush together and
secure them with 8 - 1 1/4" screws. Important- if there is a gap between Ridge Boards, try pushing rear
wall and Door Header closer together from outside. Walls should be 70" apart at top from inside of wall
plate to wall plate.
40.
With both Ridge Boards
connected, completely secure Gable
framing to walls and rafters. Use 3 - 2"
screws per Rafter. Use an additional
6 - 2" screws to secure Gable to wall.
Note- you may have to remove the 2
temporary screws in Gable from
Step 29 and reposition Gable for best
fit prior to completing gable
attachment.
1-888-658-1658
Completed rear side Rafters.
www.outdoorlivingtoday.com
Page 18
Ridge Boards
together with
1 1/4" screws
sales@outdoorlivingtoday.com
Screw

Advertisement

loading