Installation Of Lock Groups, Drawers; And Pull-Out Shelves; Assembly Of A Single Central Lock (From The Middle To The Bottom); Assembly Of A Double Central Lock - GARANT Shelf combination units User Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 27
5.

Installation of lock groups, drawers

and pull-out shelves

DE
5.1.

Assembly of a single central lock (from the middle to the bottom)

5.2.

Assembly of a double central lock

Proceed as for the single central lock, but also assemble to the top.
EN
5.3.

Lock group

Important note
Please note the zero setting whilst installing the connecting rod, as shown
in the image.
FR
IT
ES
38
Loosen the screws of the top storage shelf.
Clamp positioning field of the locking rod (1).
Insert locking rod.
Securely fasten screws of the top storage shelf.
Insert connecting rod (square rod, 6) with black plastic carrier (5) into
the locking rod (4).
Slide the lock panel into the cut-out (6) until it connects fully.

Advertisement

Table of Contents
loading

Table of Contents