Veris U3 Operating Instructions Manual page 43

Ec/om/ph
Hide thumbs Also See for U3:
Table of Contents

Advertisement

Testing cable at end of signal cable wiring harness
Figure 4.3
Separating Weatherpack connector
4. To ohm out the wiring harness, disconnect from the implement and check continuity through the
harness as shown in Figure 4.4. While doing so, check the pins and the sockets of the 12-pin
connector for corrosion and fit.
Figure 4.2
4.3 Testing terminal connector wire
6-7
Pub# OM20-U3-pH

Advertisement

Table of Contents
loading

Table of Contents