Electro-Hydraulic Lift Operation - Veris U3 Operating Instructions Manual

Ec/om/ph
Hide thumbs Also See for U3:
Table of Contents

Advertisement

Electro-hydraulic lift operation

1) The remote control offers simple operation of the power unit. Push button to raise and lower. Route to
prevent damage of cable. Be sure to lower the unit only as deep as needed to obtain proper penetration
of all 4 coulters.
2) Use depth collars provided to set desired operational depth. (Figure 4)
3) Prior to transport, always install the transport lock channel on the cylinder rod. (Figure 5)
4) Periodically check the fluid level of the reservoir with the implement in the lowered position. It should be
approximately 2" from top of reservoir, with the cylinder rod in the retracted position. Unit is filled with
Mobil 424 hydraulic fluid, and should be filled with compatible fluids of viscosity index between 100 and
400 ssu.
Figure 4
Depth collars
• Escaping fluid under pressure can penetrate the skin causing serious injury. Avoid the hazard by
relieving pressure before disconnecting hydraulic lines. Use a piece of paper or card-board, NOT BODY
PARTS, to check for suspected leaks.
• Wear protective gloves and safety glasses or goggles when working with hydraulic and high-pressure
wash systems.
• If an accident occurs, see a doctor immediately. Any fluid injected into the skin must be surgically removed
within a few hours or gangrene may result.
Figure 5
Transport lock
3-3
Pub# OM20-U3-pH

Advertisement

Table of Contents
loading

Table of Contents