Key Installation Points
Acceptance
When receiving the unit, please carefully check whether the unit is damaged in the transport. If
any, please record it in the delivery note and notify in written form within 72 hours. Notify the
final carrier of the petition in written form within 72 hours, and simultaneously inform the local
Trane sales office. Please thoroughly inspect the unit within 7 days after arrival of the goods. If
any damage is found, please immediately notify the carrier and the local Trane sales office.
Inspect whether the nameplate contents of the unit are correct and whether the operating power
supply is consistent with that on the nameplate of each component. The maximum deviation of
the supply voltage shall not be more than 10%.
Hoisting
Please use a forklift or crane with proper tonnage to handle this unit to its installation location.
Table of External Dimensions and Weight Parameters
Installation location
• The unit must be installed on a flat and level plane;
• It is better to install the shockproof rubber cushion, which is arranged between the host unit
• In the installation, the drainage, ventilation and maintenance space as well as others shall
• It is necessary to consider the bearing capacity of the building in the installation to arrange
Hoisting method:
Model
External Dimensions (mm)
Weight of N Type
Weight of H Type
and its load to absorb vibration;
be considered. Refer to the installation space diagram for the recommended minimum
maintenance space;
the unit base
CXAJ045 CGAJ045 CXAJ065 CGAJ065 CXAJ130 CGAJ130
2145*1000*2155
700
700
730
725
2145*1000*2155
2145*2020*2155
730
730
780
775
1320
1320
1350
1340
9