Vaporizer Connections; Production Installation Checklist - Kubota WG752 E3 Applications Manual

Table of Contents

Advertisement

[7] Vaporizer Connections

• Vaporizer Connections (WG972-GL· WG752-GL only)
The hose length between the vaporizer and carburetor must be within 300 ±20 mm (11.8 ±0.78 inch).

3. Production Installation Checklist

NOTE
• The emissions-related installation design (intake & exhaust system, gasoline fuel temperature test, etc.)
is verified during the Application Review. The Application Review must be completed before the
equipment is released to the market.
• Below is a checklist to be used during the final assembly of each production unit.
Incorporate this checklist into your manufacturing process.
Emissions-Related Installation Check List
Correct intake system confirmed at application review and/or the Exhaust Emission
1
Check Sheet installed?
2
Correct catalyst (Kubota parts) is installed?
3
Catalyst identification information is kept with the engine information?
4
Correct exhaust system installed?
5
Torque of catalyst parts installation is correct?
6
Correct spacer and related parts are installed? (If necessary)
7
Is the other parts layout around the catalyst parts correct?
8
Correct fuel system (fuel tank~purge port) confirmed at application review installed?
9
Range of engine operation speed is correct?
10
EPA and CARB emissions labels are visible?
11
The hose length between vaporizer and carburetor is correct?
12
Page
Yes
2-3
4
5
6
7
8
8
9-10
10
11
12
No

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wg972 e3Dg972 e2

Table of Contents