14 PUTTING INTO SERVICE

It is essential to perform the following checks before starting up
or testing the functioning of the storage cylinder. In particular,
check that:
− The supply cocks in the domestic water circuit are all open
− The water connections to the boiler and solar collectors
have been made correctly
− All the pipes in the water circuit have been insulated in
conformity to relevant standards
− The electrical connections have been made correctly
(using the hoses provided to route the cables on models
200 to 550.) See page 9 as well as the manuals for all
installed accessories
− Shut down the water heating system connected to the
storage cylinder as instructed in its own manual.
Once the system has been started up, perform the following
checks.
− Make sure that all pumps are free and rotate in the right
direction
− Make sure that all circuits have been bled.
− Turn the main power switch OFF and make sure that the
water heating system shuts down completely.
Provided the above checks have been completed satisfactorily,
restart the system and verify its performance.

15 TEMPORARY SHUTDOWN

If you are going away for a short period of time like a weekend
or a short holiday, etc., and outdoor temperatures are going to
remain above ZERO, proceed as follows.
− Adjust the storage cylinder thermostat to its minimum
setting.
9
If outdoor temperature may drop below ZERO (risk of
freezing) perform the operations described in the "Preparing
for extended periods of disuse" section.

16 PREPARING FOR EXTENDED PERIODS OF DISUSE

If the storage cylinder is not going to be used for an extended
period of time, perform the following operations:
− Switch the electricity supply to the storage cylinder's
valve group and to any associated boiler OFF at the main
switch and at the control panel
− Close the shut-off cocks for the domestic hot water circuit.
9
Drain the central heating circuit and domestic hot water
circuit if there is any risk of freezing.