To Install The Ci Interface Tip Seal - HP 5973 MSD Hardware Manual

Table of Contents

Advertisement

 CI setup
7R LQVWDOO WKH &, LQWHUIDFH WLS VHDO

To install the CI interface tip seal

Materials needed:
Interface tip seal (G1099-60412)
The interface tip seal must be in place for CI operation. It is necessary to achieve
adequate ion source pressure for CI.
C A U T I O N
Electrostatic discharges to analyzer components are conducted to the side board where
they can damage sensitive components. Wear a grounded anti-static wrist strap
and take other anti-static precautions EHIRUH you open the vacuum manifold.
1 9HQW WKH 06' DQG RSHQ WKH DQDO\]HU 6HH SDJH 
2 5HPRYH WKH VHDO IURP WKH LRQ VRXUFH VWRUDJH ER[
3 3ODFH WKH VHDO RYHU WKH HQG RI WKH LQWHUIDFH 6HH WKH LOOXVWUDWLRQ RQ SDJH 
To remove the seal, reverse the above steps.
4 9HULI\ WKDW WKH &, LRQ VRXUFH LV LQVWDOOHG
5 Gently FKHFN WKH DOLJQPHQW RI WKH DQDO\]HU DQG WKH LQWHUIDFH
When the analyzer is aligned correctly, the analyzer can be closed all the way with
no resistance except the spring tension from the interface tip seal.
C A U T I O N
Forcing the analyzer closed if these parts are misaligned will damage the seal or the
interface or the ion source, or will keep the sideplate from sealing.
6 <RX FDQ DOLJQ WKH DQDO\]HU DQG LQWHUIDFH E\ ZLJJOLQJ WKH VLGHSODWH RQ LWV
KLQJH
If the analyzer still won't close, contact your Hewlett-Packard service
representative.
The figure opposite shows the alignment of the interface, tip seal, and CI ion source.
48

Advertisement

Table of Contents
loading

Table of Contents