Page 2
Foreword Foreword This service manual describes the composition of the Model GR-500EXL-3 rough terrain crane, its adjustment methods and hydraulic and electric circuit diagrams. This service manual applies to the cranes with the specification numbers given below. Check the specification number on the nameplate of your crane.
Page 3
Foreword 2. External view The following is the traveling posture of the H-type outrigger specification machine. Front, rear, right, and left are the directions viewed from a position when operator sits on operator's seat with the boom directed to the front of the frame. Those directions remain invariant regardless of slewing direction of the superstructure.
Page 4
Foreword 3. Outline of specifications Spec. No. GR-500E-3-00102 Item 2M2D (General Export) No. of boom sections No. of jib stages (base (jib 1), top (jib 2)) Single top Fitted Main winch Fitted Auxiliary winch Fitted Winch Winch brake Automatic brake (Neutral brake) Drum rotation indicator Main and auxiliary Visual type...
Page 5
Foreword 4. Conversion table Length millimeter, mm centimeter, cm meter, m inch, in, ” foot, ft, ’ mile, mi kilometer, km 1×10 1×10 3.93701×10 3.28084×10 1.60934 1×10 1×10 3.93701×10 3.28084×10 6.21373×10 1×10 1×10 3.93701×10 3.28084 2.54×10 2.54 2.54×10 8.33333×10 3.048×10 3.048×10 3.048×10 1.2×10...
Page 7
Foreword 5. Drawing method of illustrations in this service manual The third angle projection method of mechanical drawing is used for the illustrations in this service manual. The third angle projection method is generally composed of the front view (the figure viewed from the front: A), top view (the figure viewed from the top: B), and right-side view (the figure viewed from the right: C) as shown below.
Page 8
6. Group index Data, Adjustment and Checks System Diagrams WA04-4610E...
Service Data Service Data [NOTICE] Standard values are values at time of vehicle shipment from TADANO. Limit values are the limits at which adjustment or part replacement is necessary. 1. Amounts of oil and coolant (1L = 2.64172 × 10...
Service Data 3.3 Hydraulic cylinder (1 m = 3.28084 ft) (1 mm = 3.93701 × 10 Remarks Standard Item value Condition and method Safety and notice Inspection conditions 1. Boom angle: 60° ± 2° (Lowering operation) 2. Boom full retraction 3.
Page 17
Service Data Remarks Standard Item value Condition and method Safety and notice Inspection conditions 1. Angle lowered by 5°± 2° from jib tilt angle upper limit (minimum offset angle) 2. Boom angle: 60° ± 2° 3. Engine stop 1° or less/ 4.
Service Data 4. Slewing section (1 mm = 3.93701 × 10 Item Standard value Remarks Horizontal play 5 mm or less Amount of slewing play Vertical play 2.5 mm or less 5. Boom section 5.1 Slide plate (1 mm = 3.93701 × 10 Replacement Standard thickness...
Service Data 5.2 Boom bending and deformation (1 mm = 3.93701 × 10 Item Standard value (mm) Remarks Overall boom bending No significant vertical or horizontal Set the machine (at full extension, maximum elevation angle, with bends shall be found along the entire level.
Service Data 5.3 Jib bending and deformation (1 mm = 3.93701 × 10 Item Standard value (mm) Remarks Check for bending of the whole jib a ≤ 9.5 a ≤ 1.5 + L /1000 No significant bending in vertical and L = 8000 horizontal direction shall be found.
Service Data 5.5 Sheave (1 mm = 3.93701 × 10 Standard of Limit of minor Item minor diameter diameter (mm) Remarks (mm) (*1) Determination of limit minor diameter (When rope of nominal diameter less than 25 Only sheaves of the mm are used) Limit minor dia.
Service Data 6. Criteria for maintenance and replacement of vehicle 6.1 Power transmission device Item Standard value Remarks Idling (min 670 ± 25 2860 ± 40 2150 Eco mode : OFF (Reference value) Max. (min Check conditions ・PTO switch : OFF When torque converter stalls Approx.
Y-1 . Y-1 . Service Data 7. Mass table The dry weights of the major components are shown in the table below. Refer the weights, and select appropriate hoisting devices when removing and installing the component. Mass Assembly name kg (lb) Slewing frame assembly (not including boom, elevating cylinder, slewing bearing, and 5850 (12870)
2.1 Winch [NOTICE] Oil temperature: 50 ± 5°C (113 - 131°F) (Hydraulic oil: TADANO Hydraulic Oil LL) Confirm set pressure on the crane information screen in the maintenance mode of AML. Shift the control lever or switch while the engine is idling, then increase engine speed.
2.2 Telescoping [NOTICE] Oil temperature: 50 ± 5°C (113 - 131°F) (Hydraulic oil: TADANO Hydraulic Oil LL) Confirm set pressure on the crane information screen in the maintenance mode of AML. Shift the control lever or switch while the engine is idling, then increase engine speed.
2.3 Elevating [NOTICE] Oil temperature: 50 ± 5°C (113 - 131°F) (Hydraulic oil: TADANO Hydraulic Oil LL) Confirm set pressure on the crane information screen in the maintenance mode of AML. Shift the control lever or switch while the engine is idling, then increase engine speed.
2.4 Slewing [NOTICE] Oil temperature: 50 ± 5°C (113 - 131°F) (Hydraulic oil: TADANO Hydraulic Oil LL) Confirm set pressure on the crane information screen in the maintenance mode of AML. Shift the control lever or switch while the engine is idling, then increase engine speed.
Service Data 2.5 Outrigger [NOTICE] Oil temperature: 50 ± 5°C (113 - 131°F) (Hydraulic oil: TADANO Hydraulic Oil LL) Shift the control lever or switch while the engine is idling, then increase engine speed. Engine Set pressure Item Check procedure...
Service Data 2.6 Steering [NOTICE] Oil temperature: 50 ± 5°C (113 - 131°F) (Hydraulic oil: TADANO Hydraulic Oil LL) Shift the control lever or switch while the engine is idling, then increase engine speed. Engine Set pressure Item Check procedure...
Adjusting Pressure (Hydraulic Pressure) 2.7 Remote control pilot pressure [NOTICE] Oil temperature: 50 ± 5°C (113 - 131°F) (Hydraulic oil: TADANO Hydraulic Oil LL) Shift the control lever or switch while the engine is idling, then increase engine speed. Engine...
Y-2 . Y-2 . Adjusting Pressure (Hydraulic Pressure) 2.8 Torque converter oil pressure Engine Set pressure Item Check procedure speed kgf/cm (min 1. Turn the PTO switch OFF with the air 1.4 or over 14 or over 200 or over Torque conditioner OFF.
Air Bleeding Procedure Air Bleeding Procedure 1.2 Main pump 1. Hydraulic pump 1. Fill the hydraulic oil tank with the hydraulic oil. (If the suction section is disassembled due to repair [NOTICE] or other reasons, bleed from the air-bleed plug on Be sure that the following conditions are met before the suction side as described above.) starting the engine.
Air Bleeding Procedure 1.3 Main pump (when the tank pressurization 6. If any abnormality is found, bleed the hydraulic tool is used) pump again. [NOTICE] Adjust the pressure setting of the tank 7. If there is no abnormal noise, turn ON the PTO pressurization tool to 15 kPa {0.15 kgf/cm } (2.2 psi).
Air Bleeding Procedure 2. Winch brake 3. Service brake [NOTICE] [NOTICE] When hoisting down or hoisting up the winch, pay The vehicle has two boosters; one for the front attention to the hook block position. wheel brakes and the other for the rear wheel brakes.
Air Bleeding Procedure 4.2 Winch motor 4. Hydraulic motor assy [NOTICE] 4.1 Slewing motor Do not apply any load to the motor before completing air bleeding. [NOTICE] Do not apply any load to the motor before Bleed the main and auxiliary winch motors by completing air bleeding.
Air Bleeding Procedure 5. Slewing control valve 2 Elevating (back-pressure valve) Pull out the connector (CN100) of the AML vent [NOTICE] solenoid valve. Conditions Move the boom elevating lever fully to the boom Engine speed : Max. (2150 min : ON lowering side.
Y-4 . Y-4 . Air Bleeding Procedure 7. Hydraulic valve (winch brake) [NOTICE] Bleed this valve after the pilot circuit (hydraulic pilot control valve) (See the section 7.) and the positive control (See the section 8.) are bled. Conditions Engine speed : Idling (670 min : ON 1.
Adjusting Procedure (Electric) Adjusting Procedure 2. 2nd boom full retraction (Electric) detection switch (CN553) 1. 3rd/top boom full retraction detection △ 343-638-32000 switch (CN859) Adjust the switch position so that its contact is △ 343-638-32000 shifted (opened/closed) when the 2nd boom section is extended/retracted.
Adjusting Procedure (Electric) 3. Jib lock pin detection switch (CN573) 4. Jib connection pin detection switch △ (CN572) 343-550-20000 1. Slewing the jib from the side of the boom, and △ 343-550-20000 secure it on the bottom face of the boom (by 1.
Adjusting Procedure (Electric) 5. Main winch drum rotation detection 6. Aux. winch drum rotation detection switch (CN591) switch (CN592) △ △ 343-638-94000 343-638-94000 Adjust the switch position so that the dimension A Follow the same procedure as that in main winch +0.2 +0.08 becomes 3.5...
Adjusting Procedure (Electric) 7. Over-front detection switch (CN521) 8. Straight ahead detection switch (CN408) △ 343-731-10000 Fully retract the boom and slewing it to the over-front. △ 349-610-00000 Insert the slewing lock pin and set the boom angle to Set the rear wheels in a straight-forward position, 0°.
Y-5 . Y-5 . Adjusting Procedure (Electric) 9. Over-unwinding detection switch 10. Over-unwinding detection switch (main winch) (option) (CN595) (aux. winch) (option) (CN596) △ △ 344-454-30000 344-454-20000 Adjust the roller assy position by the bolt Z so that Follow the same procedure as that in the dimension A becomes 5 mm (0.2 in), and lock over-unwinding detection switch (main winch) the bolt Z with a nut.
Assembly Adjustment (Crane Operation) Assembly Adjustment (Crane Operation) 1. Adjusting boom telescoping wire ropes 1. With the boom fully retracted, tighten the nut-A until a tension is placed on the top boom section retraction wire rope (to keep the boom fully retracted). 2.
Page 47
Assembly Adjustment (Crane Operation) 3. Tighten the two nuts-C equally until the top boom section extends by 1 to 5 mm (0.04 to 0.2 in) from the 4th boom section. 4. Tighten the nut-A until the top and 4th boom sections are fully retracted. 5.
Page 48
Assembly Adjustment (Crane Operation) 6. Check the tension of the two 4th boom section extension wire ropes. 7. When the wire rope is slack: 8. When the wire rope is tense: 7.1 Tighten the two nuts-B by approximately a third turn equally. 7.2 Extend the boom by 200 to 300 mm (8 to 12 in) by operating the boom telescoping control lever and then retract it fully.
Page 49
Assembly Adjustment (Crane Operation) 9. When only the 4th boom section is not fully retracted: 9.1 Tighten two nuts-C by approximately a third turn equally. 9.2 Extend the boom by 200 to 300mm (8 to 12 in) by operating the boom telescoping control lever and then retract it fully.
Y-6 . Y-6 . Assembly Adjustment (Crane Operation) 2. Installing and adjusting anti-buckling bolts for telescoping cylinders 1. Connect the boom and telescoping cylinder using the pins A and B. 2. Adjust the bolt C locked with nuts D and E so that it can be turned by hand and the clearance (S) is 0.5 mm (0.02in) or less.
Assembly Adjustment (Traveling Device) Assembly Adjustment (Traveling Device) 1. Service brake adjustment 1.1 Adjusting the brake pedal With the pedal weight causing the roller to contact the plunger, adjust the bolt until it contacts the stopper, then use the nut to lock it in place. Reserve tank (II) 1.2 Tightening the cap of reserve tank of service brake fluid...
Assembly Adjustment (Traveling Device) 2. Accelerator adjustment 2.1 Accelerator pedal 1. Adjust bolt F so that lever I is vertical, then lock the bolt with the nut. 2. Move the accelerator sensor lever so that it contacts stopper C. Then adjust nut H until there is no pedal play.
Assembly Adjustment (Traveling Device) 3. Parking brake adjustment 4. Tire and steering angle adjustment 4.1 Tire air pressure 3.1 Connecting the parking brake and brake Unit: kPa {kgf/cm } (psi) chamber On-rubber Tire size Traveling (1) Shift the rod of the brake chamber to the end of operation its stroke.
Y-7 . Y-7 . Assembly Adjustment (Traveling Device) 6.2 Adding oil to the torque converter and 5. Engine speed (and governor setting) transmission [NOTICE] [NOTICE] When checking the oil level, turn PTO OFF and turn Before checking the engine speed, run the engine the air conditioner OFF.
Operation Check (Crane Operation) Operation Check (Crane Operation) 1. Outrigger status indicator Main switch : ON Shift lever : Not in N position Operate the outrigger extend/retract selector switch. Icon flashes on the AML display. Press all outrigger control switch. Outriggers do not operate.
Operation Check (Crane Operation) 2. Hoisting 5. Jib side up function [Condition] 1. Automatic stop by two-blocking must not occur • Load : None while the jib set status is registered. • Engine speed : Approximately 670 min 2. While the jib is mounted, check that the jib to medium speed stowing (by retracting the cylinder) is not available [Procedure]...
Operation Check (Crane Operation) 7. Warning [NOTICE] For the location of the buzzers, refer to "Z-10 Electric Parts Location Diagram (Upper), 1. Inside cab ". Warning Item Sound Checking procedure buzzer • 280Hz Buzzer sounds at 100% when main switch is ON and PTO Buzzer AML limit •...
Y-8 . Y-8 . Operation Check (Crane Operation) 9. Over-unwinding detection check (option) Check that the over-unwinding detection activates and the winch stops when the wire rope on the winch drum decreases to or below 3 turns. 10. Eco mode operation check [NOTICE] For the location of the switch, refer to “Z-10 Electric Parts Location Diagram (Upper), 1.
Operation Check (Traveling Device) Operation Check 2. Automatic transmission (Traveling Device) [1 km/h = 0.6214 MPH] [NOTICE] 1. Exhaust brake Numbers indicate speedometer readings. (units: km/h) [NOTICE] ( ) Indicates lock-up ON and OFF values. Jack up the crane and make sure the crane is set up horizontally and all tires are off the ground.
Operation Check (Traveling Device) 3. Steering mode change Change the steering mode switch to 4-wheel or crab steering. Turn the steering wheel, and check the steering. Check that the indicator in the right bottom of the instrument panel is ON, except when rear wheels are out of straight-ahead condition.
Operation Check (Traveling Device) 5. Checking differential lock operation <Checking alarms> (interwheel differential lock) Rotate the wheels either while the vehicle is [NOTICE] underway, or while it is jacked up. Jack up the vehicle and shift to 4WD High position. Perform the operations below and check the shift [NOTICE] position with the combination meter.
Operation Check (Traveling Device) 6. Warning [NOTICE] For the location of the buzzer, refer to "Z-10 Electric Parts Location Diagram (Upper), 1. Inside cab " . [1 km/h = 0.6214 MPH] Warning Item Sound Check conditions buzzer Buzzer sounds when the following conditions are met. 1.
Operation Check (Traveling Device) 8. Emergency accelerator switch 1. Turn the emergency accelerator switch ON with the shift lever is “N” position. 2. Depressing the accelerator pedal slightly, make sure that the engine speed is 2860 ± 40min 9. Emergency transmission switch 1.
Y-1 0 . Y-1 0 . Inspection and Maintenance Y-10 Inspection and Maintenance 1. Refer to “Inspection and Maintenance” in “Operation and Maintenance Manual” of its applicable crane. 2. Maintenance of Line Filter Maintenance table Inspection and maintenance interval Parts Parts name (used) Type of work Points/Quantity...
Y-1 1 . Y-1 1 . Boom Connecting Pin and Thread Size Table Y-11 Boom Connecting Pin and Thread Size Table (Note): “ ” means that more than one spec. No. are applicable. (Unit: mm) (1 mm = 0.039 inch) Applicable spec.
Page 69
System Diagrams Contents Z-1 Hydraulic Circuit ......1 Electric circuit (boom, jib, single top, two-blocking and anemometer Comparison table of hydraulic parts (option)) ..........14 (part No., part name, Electric circuit (GSMT) ......15 coordinate and location) ....1 Electric circuit (SCT) ......... 16 Hydraulic circuit diagram ......
Hydraulic Circuit “Location” shows each applicable paragraph No. of this manual’s contents. Hydraulic Circuit Refer to the contents. 1. Comparison table of hydraulic parts (part No., part name, coordinate and location) Hydraulic Hydraulic Hydraulic Part No. Part name circuit Location Part No.
Z-1. Z-1. Z-1. Hydraulic Circuit 2. Hydraulic circuit diagram [NOTICE] ・ ・ Refer to page 1 about hydraulic parts name and number. ・Refer to Y-2 Adjusting pressure (hydraulic pressure) about relief symbol ・ (A, B, C, D, E, G, H, I, J, Q, R, V, W) in the figure. ・Outrigger solenoid valve codes (FL), (FR), (RL) and (RR) indicate each installation location of the valve.
Page 76
Electric Circuit (Upper) Z-4 Electric Circuit (Upper) 1. Composition of electric circuit diagram The electric circuit diagram of this machine is composed of “Z-4 Electric Circuit (Upper)” and “Z-5 Electric Circuit (Lower)” mainly. The electric circuit (upper) is shown by following block diagram. CN1635 Z-14 Z-4 4.6...
Electric Circuit (Upper) 2. Reading method of electric circuit 5) Shield line(GND) diagram Wire to establish GND by diverging another wire to the shield line 2.1 Notational convention S ○○ – AA ■Conditions Signal distinction Wire number symbol 1. Crane : traveling condition 2.
Electric Circuit (Upper) 2.2 Composition of switch (for reference) Rocker switch (the switch of lower electric circuit contains it.) Parking brake switch Remarks Switch Middle Down PARK Working lamp, Main and aux. winch high-speed selection, Emergency mission, Emergency accelerator PARK Slider/Jack (O/R), Ext./Ret.
Electric Circuit (Upper) “Electric circuit diagram” and “Harness diagram” show each applicable paragraph No. of this manual’s contents. Refer to the contents. 3. Comparison table (connector No., usage, description, coordinate and paragraph No.) Electric Electric Electric Electric Harness Harness CN No. Usage Description circuit...
Page 80
Electric Circuit (Upper) Electric Electric Electric Electric Harness Harness CN No. Usage Description circuit circuit CN No. Usage Description circuit circuit diagram diagram coordinate diagram coordinate diagram CN878 CN1610 O-17 Fuse box (1) N-17 CN879 CN1611 O-16 Fuse box (3) Z-4 4.2 CN880 CN1612...
Page 81
Electric Circuit (Upper) 4. Electric circuit 4.1 Electric circuit (crane) CAB OUT [NOTICE] GREEN BLUE BLUE JC13-1 JC13-2 JC13-3 1. If not specified, wire type is CAVS and wire size is 0.5mm Joint connector to “slewing table, left” 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 CN1206...
Page 82
Electric Circuit (Upper) 4.2 Electric circuit (carrier) Combination meter CN1020 GREEN GREEN BLUE Combination switch GREEN GREEN GREEN GREEN BLUE Parking brake switch [NOTICE] To electric circuit (crane) CAB OUT To electric circuit (crane) JC05-1 JC05-2 JC05-3 INSTRUMENT PANAL JC07-1 JC07-2 JC07-3 JC08-1...
Z- 4 Z- 4 Z- 4 Electric Circuit (Upper) 4.3 Electric circuit (slewing table, right) [NOTICE] 1. If not specified, wire type is AVS and wire size is 0.5mm Pressure sensor (elevating cylinder, boom raising) CN584 (S03-021) W Output (S03-022) B (S03-023) R SHIELD3 Pressure sensor (elevating cylinder, boom lowering)
Z- 4 Z- 4 Z- 4 Electric Circuit (Upper) 4.4 Electric circuit (slewing table, left) [NOTICE] 1. If not specified, wire type is AVS and wire size is 0.5mm Jib set retract Jib set extend solenoid valve solenoid valve SL191 SL190 Joint connector to “boom”...
△ Applicable serial No. : 541325 -- Z- 4 Z- 4 Z- 4 Electric Circuit (Upper) 4.5 Electric circuit (boom, jib, single top, two-blocking and anemometer (option)) [NOTICE] 1. If not specified, wire type is AVS and wire size is 0.5mm Boom length and angle detector Joint connector to “slewing table left”...
Z- 4 Z- 4 Z- 4 Electric Circuit (Upper) 4.6 Electric circuit (GSMT) [NOTICE] 1.If not specified, wire type is CAVS and wire size is 0.5mm Joint connector to “carrier” GSMT (global system for mobile communications terminal) CN1072 CN1584 (016AC) Y/L (016AC) Y/L KEY_Power_Supply 1-15...
Z- 4. Z- 4. Z- 4. Electric Circuit (Upper) 4.7 Electric circuit (SCT) [NOTICE] 1.If not specified, wire type is CAVS and wire size is 0.5mm SCT (Satellite communications terminal) CN1068 (016AC) Y/L KEY_ON (006AC) O BATT (B51AF) B 1-11 (B51AG) B 1-12 (B51AH) B...
Electric Circuit (Lower) Z-5 Electric Circuit (Lower) 1. Composition of electric circuit diagram The electric circuit diagram of this machine is composed of “Z-4 Electric Circuit (Upper)” and “Z-5 Electric Circuit (Lower)” mainly. The electric circuit (lower) is shown by following block diagram. Z-5 3.1 Z-5 3.3 Electric circuit...
Page 89
“Electric circuit diagram” and “Harness diagram” show each Electric Circuit (Lower) applicable paragraph No. of this manual’s contents. Refer to the contents. 2. Comparison table (connector No., usage, description, coordinate and paragraph No.) Electric Electric Electric Electric Harness Harness CN No. Usage Description circuit...
Page 90
Electric Circuit (Lower) Electric Electric Electric Electric Harness Harness CN No. Usage Description circuit circuit CN No. Usage Description circuit circuit diagram diagram coordinate diagram coordinate diagram Joint connector to ”air and fuel” C-19 Z-5 3.1 Z-13 1.2 RB12 Emergency engine stop relay Energize: emergency stop switch "ON"...
Page 91
Electric Circuit (Lower) 3. Electric circuit 3.1 Electric circuit (main) For VCU maintenance VCU box assy-2 [NOTICE] To electric circuit (engine) CN619 BLUE YELLOW GREEN CN1(MAIN) AMP025 CN600 (802AA) L/G (coordinate: A-2, B-2 and C-2) JC04-1 JC04-2 AVS→CAVS JC04-3 1. If not specified, wire type is CAVS and wire size is 0.5mm (800AA) L/R (800AA) L/R VCU rewriting...
Z-5. Z-5. Z-5. Electric Circuit (Lower) 3.3 Electric circuit (air and fuel) [NOTICE] 1.If not specified, wire type is AVS and wire size is 0.5mm CN054 (092AA) R/Y SL54 (655AA) B/W Air solenoid valve (exhaust brake) Remaining brake fluid detection switch CN411 (123AB) R Air pressure detection switch...
Z-10 Z-10 Z-10 Electric Parts Location Diagram (Upper) 4. Pressure switch installation diagram Switch operating list Lever operation Switch name Note Main winch hoisting up Pull Neutral Push detection switch Main winch hoisting down detection switch CN532 Di9+ Hoisting up detection CN546 Main winch Hoisting down detection...
Z-10 Z-10 Z-10 Electric Parts Location Diagram (Upper) 5. Two-blocking 5.1 Boom (two-blocking) Ground Snap pin When not using main-hook, insert CN859 into the hole of switch assy to 3rd/top boom full retraction cancel the anti-two-block function. detection switch Harness (boom head) Harness (boom head) CN901 Joint connector...
Z-11. Z-11. Z-11. Electric Parts Location Diagram (Lower) 3. Relay and fuse box (under the battery) Short bar side Fuse connector No. CN691 Fuse Pole CNNo. CN1680 CN1683 Fuse (upper power CN1681 CN731, CN732 supply)(75A) Fuse CN778 box (1) CN1684 CN619 RA22 CN733, CN734...
Z-14 Z-14 Z-14 Anemometer (Option) 2. Electric circuit ( anemometer 2.1 Composition of electric circuit diagram The electric circuit (anemometer) is shown by following block diagram. Anemometer (option) Z-14 2.3.3 Electric circuit CN1426 Cord reel (jib) Z-14 2.3.1 Z-14 2.3.2 Jib 2, head Electric circuit Electric circuit...
Z-1 4 Anemometer (Option) Z-1 4 2.2 Comparison table (connector No., usage and paragraph No.) “Electric circuit diagram” and “Harness diagram” show each applicable paragraph No. of this manual’s contents. Refer to the contents. Electric Harness CN No. Usage circuit diagram diagram CN634...
Z-14 Z-14 Anemometer (Option) 2.3 Electric circuit 2.3.1 Electric circuit (slewing table, left) [NOTICE] 1. If not specified, wire type is CAVS and wire size is 0.5mm Joint connector to “boom” CN1425 (S64-171) R Aviation obstruction light power supply (24V) (S64-147) W Anemometer power supply (24V) (S64-148) B...
Z-14 Z-14 Anemometer (Option) △ 2.3.2 Electric circuit (boom) Applicable serial No. : 541307 -- [NOTICE] 1. If not specified, wire type is AVS and wire size is 0.5mm Joint connector Joint connector to “slewing table, left” to “jib” CN1425 CN1426 (S66-171) R (S66-171) R...
Z-14 Z-14 Z-14 Anemometer (Option) 2.3.3 Electric circuit (jib) [NOTICE] 1. If not specified, wire type is CAVS and wire size is 0.85mm Anemometer Joint connector to “boom” Joint connector (anemometer) CN1426 CN1495 When operating main boom or single top, When operating jib, Aviation obstruction light power supply (24V) connect this connector.
Z-1 4 . Anemometer (Option) Z-1 4 . 5. Adjustment (anemometer) 5.1 AML set up Setup the option in AML adjustment mode. 1. Select "Option Select" in the adjustment main menu, then press the < > key to display the option selection screen.
Page 151
Z-15 Z-15 Z-15 Beacon Lamp (Option) Z-15 Beacon Lamp (Option) 1. Structure (beacon lamp) Front Beacon lamp Plug connector When not using beacon lamp, connect plug connectors together. CN1795 Beacon lamp switch CN1794 CN1794 Harness (beacon lamp) Joint connector CN1796 View A IWZ02-6820E01 WZ02-6820E...
Page 161
Head Office Ko-34,Sinden-cho, Takamatsu, Japan Overseas Service Group Tadano Ryogoku Bldg. 4-12, Kamezawa 2-chome, Sumida-ku, Tokyo, Japan Tel. 81 (3) 3621-7765 Tel fax 81 (3) 3621-7785 Document Completion:March, 2015 History of revision...
Need help?
Do you have a question about the GR-500EXL-3 and is the answer not in the manual?
Questions and answers