SPORTSPOWER 3VY6U Assembly Instruction Manual

Double swing & glide

Advertisement

INSTRUCTION
45 minutes
APPROXIMATE ASSEMBLY TIME
REQUIRED ASSEMBLY TOOLS
3VY6U
DOUBLE SWING & GLIDE
2 PERSON ASSEMBLY
20/F, Parkview Centre, 7 Lau Li Street, Causeway Bay, Hong Kong.
After Service Centre (+44) 0330 0904 420
FLOOR AREA
3M X 2M X 2M
REQUIRED ASSEMBLY SPACE
WEIGHT 19 KG, BUILD IN LOCATION
ASSEMBLED DIMENSIONS

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 3VY6U and is the answer not in the manual?

Questions and answers

Summary of Contents for SPORTSPOWER 3VY6U

  • Page 1 DESCRIPTION ASSEMBLY 3VY6U INSTRUCTION DOUBLE SWING & GLIDE FLOOR AREA 3M X 2M X 2M 45 minutes APPROXIMATE ASSEMBLY TIME 2 PERSON ASSEMBLY REQUIRED ASSEMBLY SPACE WEIGHT 19 KG, BUILD IN LOCATION REQUIRED ASSEMBLY TOOLS ASSEMBLED DIMENSIONS 20/F, Parkview Centre, 7 Lau Li Street, Causeway Bay, Hong Kong.
  • Page 2 DESCRIPTION ASSEMBLY 3VY6U INSTRUCTION DOUBLE SWING & GLIDE • We suggest you spend some time reading this guide before following the simple step-by-step assembly instructions. • Do not discard any of the packaging until you have checked that you have all parts and fittings listed. When discarding packaging take care and consideration for others and the environment.
  • Page 3 DESCRIPTION ASSEMBLY 3VY6U INSTRUCTION DOUBLE SWING & GLIDE • WARNING! Not suitable for children under 36 months. Small parts/long cord- Strangulation Hazard. • This unit is designed to be used safely by up to 4 children between the age of 3 to 8.
  • Page 4 DESCRIPTION ASSEMBLY 3VY6U INSTRUCTION DOUBLE SWING & GLIDE • DO NOT allow children to climb or play on the equipment whilst wet (slips or falls may occur). • DO NOT allo w child ren to climb on or swing f rom str uctural mem- bers (e.g.
  • Page 5 DESCRIPTION ASSEMBLY 3VY6U INSTRUCTION DOUBLE SWING & GLIDE • Shredded bark mulch, wood chips, fine sand or fine gravel are considered to be acceptable shock-absorbing surfaces when installed and maintained at a sufficient depth under and around playground equipment. However each material is only effective when properly maintained.
  • Page 6 DESCRIPTION ASSEMBLY 3VY6U INSTRUCTION DOUBLE SWING & GLIDE 20/F, Parkview Centre, 7 Lau Li Street, Causeway Bay, Hong Kong. After Service Centre (+44) 0330 0904 420 PAGE 6 OF 19...
  • Page 7 DESCRIPTION ASSEMBLY 3VY6U INSTRUCTION DOUBLE SWING & GLIDE PART LIST TOP SUPPORT BAR SW-BEAM TOP SUPPORT BAR SW-BEAM-MID TOP SUPPORT BAR SW-BEAMSHORT GLIDER SUPPORT CHANNEL SW031H-SUPCHANNEL ANCHOR SW-ANCHOR2 UPPER LEG SW-LEG LEFT UPPER LEG SW-LEG RIGHT LOWER LEG SW-LOWLEG CROSS BAR...
  • Page 8 DESCRIPTION ASSEMBLY 3VY6U INSTRUCTION DOUBLE SWING & GLIDE 10cm M8×62mm M8×50mm M8×114mm M8×95mm M8×20mm M6×36mm BOLT BOLT "U" BOLT BOLT BOLT BOLT 20/F, Parkview Centre, 7 Lau Li Street, Causeway Bay, Hong Kong. After Service Centre (+44) 0330 0904 420...
  • Page 9 DESCRIPTION ASSEMBLY 3VY6U INSTRUCTION DOUBLE SWING & GLIDE 10cm M6×60mm M6×36mm M8×54mm BOLT BOLT BOLT 20/F, Parkview Centre, 7 Lau Li Street, Causeway Bay, Hong Kong. After Service Centre (+44) 0330 0904 420 PAGE 9 OF 19...
  • Page 10 DESCRIPTION ASSEMBLY 3VY6U INSTRUCTION DOUBLE SWING & GLIDE 10cm ARC WASHER FLAT WASHER ARC WASHER SPRING WASHER SPRING WASHER 20/F, Parkview Centre, 7 Lau Li Street, Causeway Bay, Hong Kong. After Service Centre (+44) 0330 0904 420 PAGE 10 OF 19...
  • Page 11 DESCRIPTION ASSEMBLY 3VY6U INSTRUCTION DOUBLE SWING & GLIDE 10cm ALLEN KEY ALLEN KEY SPANNER GEN-ALWR4MM GEN-ALWR6MM GEN-SPAN5-11-13 20/F, Parkview Centre, 7 Lau Li Street, Causeway Bay, Hong Kong. After Service Centre (+44) 0330 0904 420 PAGE 11 OF 19...
  • Page 12 DESCRIPTION ASSEMBLY 3VY6U INSTRUCTION DOUBLE SWING & GLIDE Step 1 x 2pcs x 4pcs x 2pcs x 2pcs 20/F, Parkview Centre, 7 Lau Li Street, Causeway Bay, Hong Kong. After Service Centre (+44) 0330 0904 420 PAGE 12 OF 19...
  • Page 13 DESCRIPTION ASSEMBLY 3VY6U INSTRUCTION DOUBLE SWING & GLIDE Step 2 x 3pcs x 6pcs x 3pcs x 3pcs 20/F, Parkview Centre, 7 Lau Li Street, Causeway Bay, Hong Kong. After Service Centre (+44) 0330 0904 420 PAGE 13 OF 19...
  • Page 14 DESCRIPTION ASSEMBLY 3VY6U INSTRUCTION DOUBLE SWING & GLIDE TIPS: ENSURE TO ATTACH THE SWING SEAT TO Step 3 THE U BOLT FIRST. x 4pcs x 16pcs x 8pcs x 8pcs 20/F, Parkview Centre, 7 Lau Li Street, Causeway Bay, Hong Kong.
  • Page 15 DESCRIPTION ASSEMBLY 3VY6U INSTRUCTION DOUBLE SWING & GLIDE Step 4 TIPS: #1 PLEASE ATTACH THE PLASTIC CAP(18) TO THE CROSS BAR(9) FIRST. #2 THE CROSS BAR (9) NEEDS TO BE ATTACHED TO THE OUTER SIDE OF THE SWING FRAME x 4pcs...
  • Page 16 DESCRIPTION ASSEMBLY 3VY6U INSTRUCTION DOUBLE SWING & GLIDE Step 5 NOTE : ENSURE TO ATTACH THE PLASTIC TUBE(17) . x 4pcs x 2pcs x 2pcs x 2pcs 20/F, Parkview Centre, 7 Lau Li Street, Causeway Bay, Hong Kong. After Service Centre (+44) 0330 0904 420...
  • Page 17 DESCRIPTION ASSEMBLY 3VY6U INSTRUCTION DOUBLE SWING & GLIDE Step 6 O M K x 4pcs x 2pcs x 2pcs x 2pcs x 2pcs x 4pcs x 2pcs x 2pcs 20/F, Parkview Centre, 7 Lau Li Street, Causeway Bay, Hong Kong.
  • Page 18 DESCRIPTION ASSEMBLY 3VY6U INSTRUCTION DOUBLE SWING & GLIDE Step 7 I L M x 4pcs x 2pcs x 2pcs x 2pcs x 4pcs x 4pcs x 4pcs x 4pcs 20/F, Parkview Centre, 7 Lau Li Street, Causeway Bay, Hong Kong.
  • Page 19 DESCRIPTION ASSEMBLY 3VY6U INSTRUCTION DOUBLE SWING & GLIDE Step 8 minimum clearance between the footrest and the ground. IMPORTANT: The product must be anchored into the ground. For optimum safety and performance, we recommend concreting in the corners as shown in the diagram.

Table of Contents

Save PDF