If the instrument cannot be calibrated, do not use until the reason can be determined and corrected.
Do not cover or obstruct display or visual alarm cover.
Ensure sensor inlets are unobstructed and is free of debris.
4.3.5
Field Calibration Kit – CD6-FCK
A Field Calibration Kit, CD6-FCK, is needed to complete a CO
 CD6-FCK: (2) Gas Cylinders
o (1) 34L 400ppm carbon dioxide (CO
o (1) 34L 5000ppm carbon dioxide (CO
 Gas regulator 0.2 LPM
 About two feet of tubing
 CD-6-TH calibration hood
4.3.6

FCK Information

Several detectors can be calibrated with one FCK. The only limitation is the amount of gas in the cylinder. The 34-liter cylinder has
approximately 175 minutes of continuous test run time. Replacement cylinders are available. The gas cylinder should be replaced when
the pressure gauge on the regulator shows 25-psi or less or has reached its expiration date.
Note: For optimum test results it is suggested that the unit be in clean air, green light on, and be in a low ambient air flow.
4.3.7

Gas Testing

1. Remove the Philips screw on the front of the CD-6"x". Remove the front cover.
2. Open the FCK. Connect the 5000-ppm gas cylinder to the regulator.
3. Check the pressure gauge on the regulator. If you have 25-psi or less you will need to replace the gas canister.
Check the expiration date on the cylinder, if it has passed the expiration date the cylinder should be replaced.
4. Assemble regulator, hose and Test Hood and place the Test Hood over the CO
Note: The time to activate the Fan relay depends on the delay setting. See section
gas test. These are available through local distribution.
2
) in air
2
) in air
2
4.3.8
Testing the Fan Relay
18
sensor.
2
3.5.8 Selecting Fan Relay Delay