Dismantling - Kohler KD83V16 Operation And Maintenance Manual

Table of Contents

Advertisement

Control and operation

Dismantling

4.3 Dismantling
The dismantling must be carried out or supervised by a trained and qualified staff.
Prepare the dismantling as follows:
u According local regulations, clarify the means and quality of the dismantling process.
u Disconnect the electrical power supply.
u Remove any electronic control or electrical connections.
u Drain all fluids.
u Remove any coolant, lubricants and fuel connections.
u Collect and dispose of waste, coolant, lubricants and fuel.
u Disassemble the component or engine according to general mechanics procedures.
70
© 2018 by Kohler Co. All rights reserved.
Operation and Maintenance Manual
KD83V16 33521030601_0_1 EN_US
2018-07

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents