Care And Preventive Maintenance - Masalta MS125-1 Operation Manual

Reversible plate compactor. ms125 series; msh160 series; msh160e series; ms250 series; ms330 series
Table of Contents

Advertisement

Check the oil level in the motor crankcase daily.
Inspect the rubber anti vibration mounts for wear or deterioration.
If the optional water tank is fitted inspect the water hose and its connections to ensure that they do not leak.
Clean the underside of the plate regularly to prevent a build up of material.
CAUTION:
Inspection and other services should
always be carried out on hard and level
ground with the engine shutdown.
Inspection and Maintenance Service Tables.
To make sure your plate compactor is always in good
working
condition
before
maintenance inspection in accordance with Tables 1
through 3.
TABLE 2. ENGINE CHECK
(For details, see separate engine Manual)
Item
Leakage of oil fuel
Every 8 hours (every day)
Tightness of fastening
Every 8 hours (every day)
Threads
Every 8 hours (every day)
Engine oil check and
(Replenish to specified
replenishment
Max. level)
Engine oil
At first 20 hours, then
replenishment
every 100 hours
Air cleaner cleaning
Every 50 hours
CAUTION:
These
operation
Adjust your inspection intervals based
on the number hours plate compactor is
in use, and particular working conditions.
Daily Service
Check for leakage of fuel or oil.
Remove soil and clean the bottom of compaction plate.
Check engine oil.
Check for loose screws including tightness. See Table 3 above (tightening torque), for retightening.

CARE AND PREVENTIVE MAINTENANCE

using,
carry
out
the
Hours of Operation
inspection
intervals
are
under
normal
conditions.
TABLE 1. MACHINE INSPECTION
Item
(Starting check)
Loosened of lost screws
Damage of any part
Function of controlling
system part
Vibrator oil check
Vibrator oil replacement
V-belt (clutch) check
TABLE 3. TIGHTENING TORQUE (in. kg/cm) Diameter
Material 6mm 8mm 10mm 12mm 14mm 16mm 18mm 20mm
4T
70
150
300
6-8T
100
250
500
11T
150
400
800
*
100 (6mm) 300-350 (8mm) 650-700 (10mm)
*(In case counter-part is of aluminium)
(Threads in use with this machine are all right handed)
Material and quality of material is marked on each bolt, and screw.
CAUTION:
for
6
Hours of Operation
Every 8 hours (every day)
Every 8 hours (every day)
Every 8 hours (every day)
Every 8 hours (every day)
Every 100 hours
Every 200 hours
Every 200 hours
500
750
1100
1400
800
1300
2000
2700
1200
2000
2900
4200
Fuel piping and connections
should be replaced every 2
years.
2000
3800
5600

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents