Download Print this page

Dynojet POWER COMMANDER V Installation Instructions Manual page 3

2017-2018 suzuki dl1000 (v-strom)

Advertisement

FIG.A
Remove
FIG.B
FIG.C
20-052
Remove
Remove
Remove
www.powercommander.com
1
Remove the seat, the body panels surrounding the fuel tank, and remove the
fuel tank (Fig. A).
2
Remove the airbox (Fig. B).
3
Using the supplied Velcro, secure the PCV module in the tail section (Fig. C).
Clean both surfaces with the supplied alcohol swab prior to applying the
Velcro adhesive.
4
Route the PCV wiring harness forward towards the engine following along the
left side frame rail.
2017-2018 Suzuki DL1000 (V-Strom) - PCV - 3

Advertisement

loading
Need help?

Need help?

Do you have a question about the POWER COMMANDER V and is the answer not in the manual?