Integrating The Inverter Into The Network; Setting The Date And Device Time; Configuring The Energy Meter - SMA SUNNY BOY 1.5 Operating Manual

Hide thumbs Also See for SUNNY BOY 1.5:
Table of Contents

Advertisement

SMA Solar Technology AG
Requirements:
☐ An update file with the current inverter firmware must be available. The update file is, for
example, available for download on the product page of the inverter at www.SMA-Solar.com.
Procedure:
1. Call up the inverter user interface (see Section 8.1, page 34).
2. Log in as Installer or User.
3. Select the menu System Configuration.
4. Select [Settings].
☑ A context menu opens.
5. In the context menu, select [Updating the firmware].
6. Follow the instructions in the dialog.

9.10 Integrating the Inverter into the Network

Requirements:
☐ The inverter must be in operation.
☐ There must be a router with Internet connection in the local network of the system.
Procedure:
1. Call up the inverter user interface (see Section 8.1, page 34).
2. Log in as Installer.
3. On the right-hand side of the menu bar, select the menu User Settings (see Section 8.2
"Design of the Inverter User Interface", page 37).
4. In the subsequent context menu, select [Start the installation assistant].
5. Perform the desired network configuration.

9.11 Setting the Date and Device Time

You can set the date and the device time of the inverter.
Procedure:
1. Call up the inverter user interface (see Section 8.1, page 34).
2. Log in as Installer or User.
3. In the status bar at the bottom, click on the date and the time.
4. In the subsequent dialog, perform the desired settings for the date and device time.

9.12 Configuring the Energy Meter

You can add an energy meter to your PV system or replace an existing energy meter.
Operating Manual
9 Configuration
SB15-25-BE-en-10
45

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sunny boy 2.5

Table of Contents