Preparation And Use; Switching On; Automatic Operation - Ceado E37J Maintenance Manual

E37 family
Hide thumbs Also See for E37J:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 22
GB

PREPARATION AND USE

Switching ON

Fill the hopper with coffee beans and close the lid.
1
2
Turn the ON-OFF switch (17 Fig. 2) to position "I".
When the appliance is switched on the display will show:

Automatic operation

3
To grind the amount of coffee for a single shot press the button
will light up and the display will show:
meaning that the appliance is ready to grind for 2 seconds. With this factory setting, the grinder
will distribute about 8 grams of medium-grain ground coffee.
To grind the amount of coffee for a double shot press the button
respective LED will light up and the display will show:
meaning that the appliance is ready to grind for 4 seconds. With this factory setting, the grinder
will distribute about 16 grams of medium-grain ground coffee.
Note: If the "extra shot" feature is activated (see Par. Extra shot setting, page 34), it is possible to
grind the desired quantity of coffee by pressing the button
Note: The factory settings of the grinding times differ depending on the model.
Note: The quantity of ground coffee which is distributed with these settings may noticeably change,
according to the kind of coffee blend and origin, the size of the coffee beans and the type of
roast, besides the weather conditions, the grinding settings and the mains frequency.
Whenever the grinding coarseness is regulated you must set a new operating time so as to
distribute the right amount of coffee required (see Par. Setting the grinding times, page 31).
27
. The respective LED
. In this case too the
.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E37tE37sE37k

Table of Contents