Solar Panel; Figure 1-18 Optional Communication Enclosure - ABB XSeries G4 6200 User Manual

Flow computer
Table of Contents

Advertisement

The battery compartment shelf houses various optional battery packs that are
available for the OEU, from eight (8) ampere hours up to 26 ampere hours.
Installation of the battery is discussed later in the manual.

1.2.8 Solar panel

A solar panel can be configured in the system to provide a charging source for the
battery. DIV 1 installations would require that the solar panel and battery pack be
installed in a General Purpose or DIV 2 area. Typically, the solar panel would be
connected through a charger regulator that is located in the 6270 OEU.
Depending upon power/charging requirements, the unit may be configured for a 5-
watt, 10-watt, 20-watt or 30-watt solar panel. The panel is designed to be mounted
on a 2-inch extension pipe.
2104349 rev. AD
The 6270 OEU system with battery and solar panel is rated for
Class I, Division 2 locations only or can be installed in non-
hazardous locations.
Figure 1–18 Optional communication enclosure
Page 1–21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xseries g4 6201ex

Table of Contents