Mira Montpellier Installation, Operation, Maintenance Manual page 27

Shower control
Table of Contents

Advertisement

Reassembly
9.
Refit the thermostatic cartridge and tighten using a suitable spanner.
10. Refit the shield adaptor, the valve shield and the shower control lever. Make sure
that you install the seal correctly in the shield.
11. Refit the grubscrew and tighten with the 2.5 mm hexagon key (supplied). Fit the
lever cap.
12. Restore the supplies to the shower control and check for any leaks.
13. The maximum temperature will now need resetting; refer to COMMISSIONING.
Lever Cap
Grub Screw
Shower Control Lever
Thermostatic Cartridge
Valve Shield
Maintenance - Thermostatic Cartridge
Figure 3
Shield Adaptor
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents