Power Switches; Figure 14 Power Switches - 10Kva Nx; Table 7 Rotary Switch Configuration - Liebert NX series Operation & Maintenance Manual

10-30kva 208v, 60hz
Table of Contents

Advertisement

3.1.1

Power Switches

The UPS can be isolated by means of power switches, mounted inside the cabinet and accessible after
opening the front door.
The location of the UPS power switches is shown in Figure 14.

Figure 14 Power switches - 10kVA NX

CB1 - Utility
Connection
Inside the door,
left side
The UPS unit power switches are CB1 and SW1.
• CB1 - Input Isolator. Connects the utility supply to the UPS input.
• SW1 - Rotary switch. Has four positions—NORMAL, BYPASS, TEST and MAINT—that corre-
spond to different positions of the SW1-A/B/C/D.
The positions of the rotary switch (SW1) are:
• SW1-A - Output Isolator. Connects the output of the UPS to the load.
• SW1-B - Neutral Isolator. Connects neutral to the UPS.
• SW1-C - Bypass Isolator. Connects the UPS with the bypass supply.
• SW1-D - Maintenance Bypass Isolator. Permits supply of the load directly by the bypass
line for maintenance of the UPS unit.
The functions of the rotary switch are shown in Table 7.
Table 7
Rotary switch configuration
Rotary
switch
OUTPUT
position
(SW1-A)
NORMAL
BYPASS
TEST
MAINT
NOTE
Do NOT turn the rotary switch too fast. Allow the rotary switch to stay in each position at least
three seconds before turning it to the next position.
BYPASS
MAINT
(SW1-C)
(SW1-D)
NEUTRAL
(SW1-B)
17
Operating Instructions
SW1 - Rotary Switch