Transport And Start Up; Transport And Installation; Assembly - Jet JWBS-9X-M Operating Instructions Manual

Wood band saw
Table of Contents

Advertisement

Available languages

Available languages

 
5.  Transport and start up 
5.1 Transport and installation 
For transport use a forklift or hand trolley. Make sure the 
machine does not tip or fall off during transport. 
The machine is designed to operate in closed rooms and must 
be placed stable on firm and levelled ground. 
The machine can be bolted down if required. 
For packing reasons the machine is not completely assembled. 
 
5.2 Assembly 
If you notice any transport damage while unpacking, notify 
your supplier immediately. Do not operate the machine! 
Dispose of the packing in an environmentally friendly manner. 
Clean all rust protected surfaces with a mild solvent. 
Rubber feet mounting: 
Assemble four rubber feet (U, Fig 3) in the corners of base with 
bolts (M6x30), washers, and nuts. 
 
Mounting the additional support: 
‐ Insert the additional support into the two holes in the rear of 
base. 
 
Fig 2 
 
Fig 3 
‐ Secure the support (O, Fig 4) with two bolts and nuts (W) 
Mounting the saw table: 
‐ Remove the table slot bolt (J, Fig 2) and wing nut. 
‐ Remove table tilt locking knob (S, Fig 7) from saw frame. 
‐ Slide the table over the blade, through the slot in the table. 
(Fig 6) 
‐ Re‐install table tilt locking knob. 
‐ Secure table in position. 
6
 
Fig 4 
 
 
Fig 5 
 
Fig 6 

Advertisement

Chapters

Table of Contents
loading

Table of Contents