SATRON VC Optical Consistency Transmitter
5.
Turn the installation tool level until the transmitter is fully inserted into the process.
6.
Fasten the transmitter in place with the locking nut E, Tightening torque 40Nm.
7.
Remove the installtion tool.
8.
To remove the transmitter from the process, reverse the steps shows for inserting
the transmitter.
Figure 1-2b Mounting the transmitter on the coupling
E
E
4
BCs220AV
Revision 2
15.10.2014