Download Print this page

Fluke 700HTP-2 Instruction Sheet page 2

Hydraulic test pump

Advertisement

Features
No.
Item
Master
Instrument Port
Test Pressure
Port
Pressure Relief
Valve Port
Vernier Fine
Adjustment Knob
Hydraulic Fluid
Reservoir
1/4-inch NPT Tee
Fitting
Handle Limiter
Reservoir Filler
Cap
Pressure Bleed
Knob
Reservoir Nut
info@Fluke-Direct.com
gsp001.eps
Function
Port for Fluke 700 Series Pressure
Module, 1/4-inch NPT female.
Port for pressure instrument under
test, 1/4-inch NPT female.
Port for an optional Fluke 700PRV-1
Pressure Relief Valve (plugged).
Lets you adjust the applied pressure
in small increments.
Holds 100 cc of mineral based
hydraulic oil, distilled water, or
hydraulic oil.
For master and test ports.
Limits the travel of the handles.
Cap which seals the hydraulic fluid
reservoir. Install before you pump.
Lets you release pressure in small
increments.
Remove nut to clean reservoir.
Fluke-Direct
Figure 1. Test Configuration
How to Operate the Test Pump
W Warning
To prevent a violent release of pressure, open the
Pressure Bleed Knob (item ) very slowly before you
disconnect pressure lines. Do not connect the Pump to
an external pressure source.
W Caution
To prevent damage when a Pressure Module or Pressure
Instrument is connected that could be damaged by
pressures of 690 bar (10,000 psi), install and correctly
set a relief valve in the system or an optional Fluke
700PRV-1 Pressure Relief Valve on the Pump.
1.
Connect a 700 Series Pressure Module (the Pressure Module)
to the Master Instrument Port (item .) To connect to a 700P
High Pressure Module (700P29, P30, or P31) install a male
1/4-inch NPT Adapter. Use Teflon
NPT thread connections to prevent leaks.
2.
Fill and Prime the Pump. See "How to Prime the Test Pump".
3.
Connect the Pressure Module to the calibrator as shown in
Figure 1.
4.
Connect the input of the Pressure Unit Under Test (UUT) to the
Test Pressure Port (item ) on the Test Pump.
Loosen the Pressure Bleed Knob (item ) to release pressure
5.
from the Pump.
6.
Use the Calibrator to zero the Pressure Module. Refer to the
Users Manual for instructions.
Turn the Vernier Fine Adjustment Knob (item ) to the
7.
middle-range.
Turn the Pressure Bleed Knob (item ) clockwise until it stops
8.
in the full closed position.
9.
Squeeze the handles together to pump fluid which will increase
pressure. See the Notes in step 2 of the "How to Prime the Test
Pump" procedure.
W Caution
To prevent damage, do not let the pressure increase to
more than the pressure rating of the equipment under
test. Pressure can increase quickly if the pressurized
volume is small.
10. For incremental pressure adjustments, use the Vernier Fine
Adjustment Knob.
11. Once the test is done, slowly turn the Pressure Bleed Knob
(item ) counter-clockwise to release pressure.
.com
gsp002.eps
®
tape or equivalent on the
1.888.475.5235

Advertisement

loading