Information; Setting; Setting Time - Ningbo Ginlong Technologies Solis-20K Installation And Operation Manual

Pv grid tie inverter, solis three phase inverter
Table of Contents

Advertisement

7. General Operation

7.2 Information

The inverter LCD provides access to operational data and information. Select
"Information" sub menu, turn the page by scrolling up or down.
Informtion
Power:
30000W
V_DC1:
500.2V
V_DC2:
500.5V
V_DC3:
499.9V
V_DC4:
502.6V
V_A:
232.0V
V_B:
231.0V
V_C:
230.5V
E S C
U P
Figure 7.4 Information (1)
Informtion
Status:
Generating
Total Energy:
0003687kWh
This Year:
0000014kWh
Last Year:
0000001kWh
This Month:
0508kWh
Last Month:
2081kWh
Today:
0071.6kWh
Yesterday:
000204kWh
E S C
Figure 7.5 Information (2)
.26.
2015-02-23 19 35
I_DC1:
15.90A
I_DC2:
15.70A
I_DC3:
15.30A
I_DC4:
16.10A
I_A:
43.5A
I_B:
43.7A
I_C:
43.4A
1 / 2
D O W N
E N T
2015-02-23 19 35
Frequency:
50.01Hz
Carbon Offset:
0003.67ton
Efficiency:
99.99%
2 / 2
U P
D O W N
E N T
7. General Operation
7.3 Settings
The following interface are displayed when the Settings menu is selected, and press the
UP/DOWN keys to select different option, press the ENTER key to enter the submenu.
Settings
Figure 7.6 Setting

7.3.1 Setting Time

This function allows time and date setting. When this function is selected,the LCD will
display as screen as shown in Figure 7.7.
Set Time/Date
YY
2015
-
HH
20
N E X T = < E N T > D O N E = < E S C >
E S C
U P
Figure 7.7 Setting time
2015-02-23 19 35
Set Time/Date
Set Address
Set Language
Brightness
Updater
2015-02-23 19 35
MM
DD
2
-
23
MM
:
53
D O W N
E N T
.27.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solis-25kSolis-30kSolis-36k-hvSolis-40k-hvSolis-30k-he

Table of Contents