Mira Advance Installation, Operation, Maintenance Manual page 20

Electric showers. standard & memory models cove
Hide thumbs Also See for Advance:
Table of Contents

Advertisement

1.18.
1.18.
1.18.
1.18.
1.18. Check that the earth bonding wire to
the inlet connector assembly is tight.
Ensure that the multi-connector lead
is clear of the cover when it is refitted.
Refit the inlet shield over the inlet
connector assembly. If the Mira
Advance has been installed with top
inlet cable or water supplies, cut the
top case insert to suit, and fit. Finally,
re-tighten the screws of the terminal
block.
1.19. Connect the wire 78 multi-connector
1.19.
1.19.
1.19.
1.19.
lead from the relay board, in the Mira
Advance, to the socket on the control
PCB located in the cover. The multi-
connector is a one way fit into the
receiving socket on the control PCB.
Ensure that the multi-connector is
correctly orientated as illustrated.
Ensure that the connector is fully
pushed home.
1.20.
1.20.
1.20. Refit the cover by locating the top of
1.20.
1.20.
the cover onto the location strip on
the top of the case. Ensure that the
wire 78 multi-connector lead is seated
between the tank body and the left-
hand side of the case.
1.21. Push the bottom of the cover against
1.21.
1.21.
1.21.
1.21.
the case until it locates correctly.
Install the screw and tighten.
1.22. Install the shower fittings, refer to the
1.22.
1.22.
1.22.
1.22.
separate Installation, Operation and
Maintenance Guide.
1.23. The high capacity spray plate
1.23.
1.23.
1.23.
1.23.
illustrated in the guide is not supplied
with this Mira Advance.
1.24.
1.24.
1.24. Now proceed to commission the
1.24.
1.24.
Mira Advance. Refer to
"Commissioning".
"Commissioning"
"Commissioning"
"Commissioning"
"Commissioning"
20
20
20
20
20
Connector Clamps
Ensure That The Connector
Is Fully Pushed Home

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents