Swegon GLOBAL PX Operation And Maintenance Instructions page 22

Applicable to program versions tac5 – version dt 2.8.8 & dg 2.7.3
Hide thumbs Also See for GLOBAL PX:
Table of Contents

Advertisement

5.7 TIME SCHEDULE
The controller allows 4 time slots (channels) to be configured. For each day of the week,
the operation mode can be either AUTO (operate according to time slots) or OFF.
For each time slot select :
In airflow control mode: the airflow by selecting m³h K1 / m³h K2 / m³h K3 / OFF (stop)
In torque control mode: the torque by selecting %TQ K1 / %TQ K2 / %TQ K3 / OFF (stop)
In demand control mode :
• with only one 0-10 V signal (default) or with 2 signals to control the
supply airflow: the link LS (percentage of the nominal link, cfr m³/h Vmin
and m³/h Vmax in setup OR cfr %TQ Vmin and %TQ Vmax in setup) and
the rate of the exhaust airflow by the supply airflow.
• with one 0-10 V signal for supply and one 0-10 V signal for exhaust (via
advanced setup): one link LS (percentage of the nominal link) for supply
and one for exhaust.
In pressure control mode :
• Constant pressure on supply or exhaust: the pressure setpoint (percentage of the
nominal setpoint) and the rate of the exhaust airflow by the supply airflow.
• Constant pressure on supply and exhaust: one pressure setpoint (percentage of the
nominal setpoint) for supply and one for exhaust.
22
Operation and maintenance instructions – v2.8.8 & 2.7.3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Global rxGlobal px top fwGlobal rx topGlobal lp fwGlobal px fw

Table of Contents