Chapter 2. Installing the RackSwitch G8264CS
This chapter describes how to install and initialize the RackSwitch G8264CS.
Required tools
You need the following tools or equipment to install the RackSwitch G8264CS:
v Standard flat-blade screwdriver
v #2 Phillips screwdriver
v Electrostatic discharge wrist strap
Package contents
The basic package contains the following items:
v G8264CS switch unit (one of the following):
v One Standard rack-mount kit that includes:
v Mini-USB to RJ-45 serial cable, category 5 patch cable, RJ-45 to DB9 adapter
v Two ac power cords
v One IBM Documentation CD which includes the IBM System Networking
v One Environmental Notices CD
v One Warranty Information document
v One Important Notices document
Environmental requirements
This section describes the basic environmental requirements for the RackSwitch
G8264CS. Make sure the location where you install the switch meets the following
requirements:
v Install the switch unit in a dry, clean, well-ventilated area.
v Provide adequate space in the front and back of the switch unit, to ensure proper
v Make sure that an adequate grounded power supply is within reach of the switch
v Make sure that twisted-pair cable is routed away from power lines, fluorescent
Preventing electric shock
This product does not contain any user-serviceable parts. Do not remove the cover
of this device.
The G8264CS ac power model is designed to work with single-phase power
systems that have a grounded neutral conductor. To reduce the risk of electric
shock, always plug the power cord into a grounded power outlet.
© Copyright IBM Corp. 2012
– G8264CS (front-to-rear) front-to-rear airflow
– G8264CS (rear-to-front) rear-to-front airflow
– Two brackets
– Screws to attach brackets to the switch unit
– Screws to attach the switch unit to the equipment rack
RackSwitch G8264CS Installation Guide (this document)
air flow.
unit.
lighting fixtures and other sources of electrical interference.
13