Cisco UCS B200 M4 Installation And Service Note page 29

Blade server
Hide thumbs Also See for UCS B200 M4:
Table of Contents

Advertisement

Servicing a Blade Server
Installing a New CPU and Heat Sink
Procedure
Step 1
Hold the CPU carrier by its sides (indicated b the arrows). Insert and align the two CPU carrier pegs into the
self-loading socket (SLS) plug seat. To ensure proper seating, verify that the horizontal yellow line below the
word ALIGN is straight.
Figure 13: Inserting the CPU Carrier
Cisco UCS B200 M4 Blade Server Installation and Service Note
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents