Installing A New Cpu And Heat Sink - Cisco UCS B200 M4 Installation And Service Note

Blade server
Hide thumbs Also See for UCS B200 M4:
Table of Contents

Advertisement

Installing a New CPU and Heat Sink

Step 3
Unhook the self-loading socket (SLS) lever
Step 4
Unhook the SLS lever .
Step 5
Grasp the sides of the CPU carrier (indicated by the arrows in the illustration) and swing it into a standing
position in the SLS plug seat.
Figure 12: CPU Carrier and SLS Plug Seat
Step 6
Pull the CPU carrier up and out of the SLS plug seat.

Installing a New CPU and Heat Sink

Before installing a new CPU in a server, verify the following:
• The CPU is supported for that given server model. This may be verified through the server Technical
• A BIOS update is available and installed that supports the CPU and the given server configuration.
• If the server will be managed by Cisco UCS Manager, the service profile for this server in Cisco UCS
• The CPUs and heat sinks are different and must be installed in the correct location. The front heat sink
Cisco UCS B200 M4 Blade Server Installation and Service Note
20
Specifications ordering guides or by the relevant release of the Cisco UCS Capability Catalog.
Manager will recognize and allow the new CPU.
and CPU 1 can only be installed in the front of the blade server and the rear heat sink and CPU 2 can
only be installed in the rear of the blade server.
.
Servicing a Blade Server

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents