Baby Lock Momentum BLQM Assembly And Use Instruction Manual page 22

Quilt frame
Table of Contents

Advertisement

Section 3-7: Important! Disengage the Clamp Rail
Lock Pin and tighten the Idler Rail Assembly by turning
the rail Counterclockwise a full rotation. Re-engage the
Clamp Rail Lock Pin ensuring the fabric is wrapped on
the Idler Rail. (Fig-S. 3-5)
Note: Section 3-7 will make the Quilting Surface flat
and taut during quilting while the sliding rail operates.
Sections: 3-2, 3-6, and 3-7 will have to be repeated as
the quilt is rolled up on the Take Up Rail.
Section 3-6: Attach the Backing Leader to the Backing
Rail using the Fabri-Fast System and ratchet the remain-
ing fabric onto the rail. (Section 1: Fabri-Fast System
and Fig-S. 3-7)
Section 3-7: Similarly, attach the Top Leader to the Top
Rail using the Fabri-Fast System and ratchet the remain-
ing fabric onto the rail. (Section 1: Fabri-Fast System
and Fig-S. 3-8)
Section 3-8: The batting can be Fabri-Fasted onto the
Batting Rail if the batting is thin, otherwise tape and roll
it onto the rail to ease batting management. (Fig-S. 3-8)
Note: The Take Up Rail and Batting Rail have no par-
ticular direction of rotation and can rotate both ways
without effecting the frames performance.
Plug the power cords back in after the fabric installation
has been completed.
Top Leader
Quilt Top
Batting
Quilt Backing
Backing Rail
Fig-S. 3-7
Take Up Leader
Fig-S. 3-5
Fig-S. 3-6
Quilt Top
Batting
Batting Rail
Fig-S. 3-8
Clamp Rail Lock
Pin
Top Rail
Page. 21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents