Function And Operation Test; Visual And Mechanical Inspection; Servicing / Storage / Maintenance; Replacing Accessories - AcraDyne ABG Series Operation And Service Manual

Battery powered nutrunners
Table of Contents

Advertisement

7.

Function and Operation Test

7.1

Visual and Mechanical Inspection

Battery packs, charger station, operating and
display elements, case and accessories, such as
reaction bars, must be regularly inspected for
damages and must be replaced professionally if
necessary.
Do not obstruct ventilation opening. Soiled
or blocked ventilation openings can cause
malfunction and damage to the motor.
In case of reduced power, strong gear noise, or
obvious severe damage, immediate repair is
necessary. Please send all devices to be repaired
in their original packaging to your nearest AIMCO
partner.
8.

Servicing / Storage / Maintenance

8.1

Replacing Accessories

See section 4.2 Preparing for Work with the Power Tool.
Follow steps in the opposite direction.
8.2

Storage in Lockable Containers

Store ABG Nutrunners and the charger station
in a dry and cooled-off state in the original case,
or in any other closable container. Heat and
moisture lead to oxidation of the gear and other
components inside the case. This can cause the
tool to malfunction and can cause damage to
the electronic circuitry and motor. When storing,
ensure that the charger station power cable is not
squeezed anywhere or damaged in any way.
ABG Battery-Powered Nutrunners
Notes for the Li-Ion rechargeable battery pack:
Always remove the battery pack from the power
tool when not in use. Do not touch or short the
contacts. Although the electronic circuitry
will protect the battery packs against complete
discharge, a long life is best ensured by maintaining
a sufficient charge in the battery pack.
In order to maintain the battery pack in a fully
charged state, a trickle charge of about 70 to 75%
is required (see illustration above).
8.3

Decommissioning

If the AcraDyne tools and devices are not used
over an extended period of time, they should be
cleaned and stored in a dry and closable space
that is inaccessible to children. The optimum
storage temperature is between 10° and 30° C
(50° and 86° F). Rotating components must be
protected against oxidation (see Section 8.2).
8.4

Service and Maintenance

The ABG Nutrunner is an extremely powerful and
robust product. To ensure long life and reliability
over many years, the machine must be serviced
at regular intervals (performance check, motor
check, safety inspection, and calibration service).
Service intervals
The power tool must be inspected at least once
per year. In the case of high usage or excessive
operating hours, servicing and calibration will
be necessary more frequently. In the case of
unusual gear noises, a gear lubrication is urgently
recommended to prevent subsequent damage.
AcraDyne ABG Nutrunners must always be packed
in the original packaging when sending items in
to your AIMCO partner or AIMCO.
10
LED display on the battery pack

Advertisement

Table of Contents
loading

Table of Contents