Check The Structural Strength; Ptz Power-On Self-Test; Please Keep All Packing Materials Of The Ptz; Installation Methods - Sony FCB-CH7500 Operation Manual

Network high speed ptz
Table of Contents

Advertisement

Confirm whether there is enough space for installing this product and its members.

4.5.3 Check the structural strength

4.5.4 PTZ power-on self-test

To ensure normal operation of the PTZ on the installation site, please connect the system control lines, video lines and power lines of the PTZ into the
corresponding sockets before installation (the wiring shall strictly comply with the labeling instructions of system control lines, video lines and power lines)
and do power-on self-test. The PTZ will execute factory default setting. If everything is normal after the test, normal installation may be conducted.

4.5.5 Please keep all packing materials of the PTZ

After the PTZ is unpacked, please take good care of the original packing materials of the PTZ so that the PTZ may be packed with its packing material and
mailed to the agent or the manufacturer in case of a problem.

4.6 Installation methods

4.6.1 Shock adsorb install ( For optional)

This products bottom can choose magnetic force recombination sucking disc, can powerfully adsorb on the top of car or any device has iron,it is very suitable
for install in many condition and it install very convenient and fast
45

Advertisement

Table of Contents
loading

Table of Contents