1
planning
»
PITCHED ROOF INSTALLATION
1.
The top of the flue must be 60cm above the
roofline. Alternatively, there must be a minimum
distance of 3 meters from any higher section of roof.
2.
Ensure the triple skin flue is installed as per
Australian standards (see diagrams below).
60cm
3m
08
1m
The minimum height of
the flue system further
than 3 meters from the
highest point of the roof
shall be 1 meter above roof
penetration.
installation and user manual
Need help?
Do you have a question about the THE AETHER and is the answer not in the manual?