Connecting The Control Cables; Default I/O Connection Diagram; Connection Procedure - ABB PVS800-57B Maintenance Manual

Central inverters
Hide thumbs Also See for PVS800-57B:
Table of Contents

Advertisement

46 Electrical installation

Connecting the control cables

Default I/O connection diagram

Terminal
Type
+
+24 V DC
-
0 V DC
1
User DI1
2
User DI2
3
User DI3
4
User DI4
5
User DI5
X2
6
User DI6
7
User DI7
8
User RO1
9
User AI2
10 User AI2
11 User AI3
12 User AI3
You can freely configure the I/O signals with different fault names and reactions. Refer to
the PVS800-57B central inverters firmware manual (3AXD50000048332 [EN]).

Connection procedure

360-degree grounding at the cabinet lead-through for the control cables:
Make sure that a proper environmental seal remains after the installation.
1. Cut adequate holes in the rubber grommets in the lead-through plate.
2. Put the cables through the grommets into the cabinet.
3. Strip the plastic sheath of the cable above the lead-through plate just enough to
ensure proper connection of the bare shield.
2
3
a
1
Note: If the outer surface of the shield is non-conductive:
Cut the shield at the midpoint of the bare part. Do not cut the conductors or the
grounding wire (if present).
Turn the shield inside out to expose its conductive surface.
Cover the turned shield and the stripped cable with copper foil to make the shielding
continuous.
Control I/O connection diagram
Rating
+24 V DC
0 V DC
24 V DC
24 V DC
24 V DC
24 V DC
24 V DC
24 V DC
24 V DC
24 V DC
4–20 mA
4–20 mA
Side view of the cable lead-through
b
a) Grommet
b) EMI conductive cushion
c) Lead-through plate
c
Functionality
Power distribution
Power distribution
+
-
+
-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents