Page 105
Power supply Standard parts Notes: Only for normal power supply installation 3 core - In case of signal cable: keep minimum distance to power cables > 5 cm unit power supply: 230 V + earth - Field supply Outdoor unit Only for preferential kWh rate power supply installation unit preferential kWh rate power supply: 3 core...
Page 107
5 kW A (kPa) B (l/min) 6 7 8 8 kW A (kPa) B (l/min) 4D082239-1C...
Page 110
GAS BOILER SYSTEM COMMISSIONING CHECKLIST This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference. Failure to install and commission according to the manufacturer’s instructions and complete this Benchmark Commissioning Checklist will invalidate the warranty.
Service Record It is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed. Service Provider Before completing the appropriate Service Record below, please ensure you have carried out the service as described in the manufacturer’s instructions.
Page 113
Field settings table ID66F3 [6.8.2] = ..Applicable indoor units *HYHBH05AAV3 *HYHBH08AAV3 *HYHBX08AAV3 Notes 4P353731-1E - 2017.02...
Page 114
Installer setting at variance with Field settings table default value Breadcrumb Field code Setting name Range, step Date Value Default value User settings Preset values Room temperature 7.4.1.1 Comfort (heating) [3-07]~[3-06], step: A.3.2.4 21°C 7.4.1.2 Eco (heating) [3-07]~[3-06], step: A.3.2.4 19°C 7.4.1.3 Comfort (cooling)
Page 115
Installer setting at variance with Field settings table default value Breadcrumb Field code Setting name Range, step Date Value Default value A.2.1.8 [7-02] Number of LWT zones 0: 1 LWT zone 1: 2 LWT zones A.2.1.9 [F-0D] Pump operation mode 0: Continuous 1: Sample 2: Request...
Page 116
Installer setting at variance with Field settings table default value Breadcrumb Field code Setting name Range, step Date Value Default value Disinfection A.4.4.1 [2-01] Disinfection 0: No 1: Yes A.4.4.2 [2-00] Operation day 0: Each day 1: Monday 2: Tuesday 3: Wednesday 4: Thursday 5: Friday...
Page 117
Installer setting at variance with Field settings table default value Breadcrumb Field code Setting name Range, step Date Value Default value [0-0D] High ambient temp. for DHW WD curve. 10~25°C, step: 1°C 15°C [0-0E] Low ambient temp. for DHW WD curve. -40~5°C, step: 1°C -10°C [1-00]...
Page 118
Installer setting at variance with Field settings table default value Breadcrumb Field code Setting name Range, step Date Value Default value [5-09] What is the requested limit for DI1? 0~20 kW, step: 0,5 kW 20 kW [5-0A] What is the requested limit for DI2? 0~20 kW, step: 0,5 kW 20 kW [5-0B]...
Page 119
Installer setting at variance with Field settings table default value Breadcrumb Field code Setting name Range, step Date Value Default value [B-00] [B-01] [B-02] [B-03] [B-04] [C-00] Domestic heating water priority. 0: Solar priority 1: Heat pump priority [C-01] [C-02] [C-03] [C-04] [C-05]...
Page 120
Installer setting at variance with Field settings table default value Breadcrumb Field code Setting name Range, step Date Value Default value [F-0C] Close shut-off valve during cooling? 0: No 1: Yes [F-0D] What is the pump operation mode? 0: Continuous 1: Sample 2: Request 4P353731-1E - 2017.02...
Page 124
ROTEX Heating Systems GmbH Langwiesenstraße 10 D-74363 Güglingen www.rotex-heating.com Unsere Partner im Ausland Our partners abroad • Unsere Partner im Ausland Nos partenaires à l’étranger • Le nostre sedi all'estero Neustros representantes en el extranjero http://de.rotex-heating.com > ueber-rotex > international...