Sign In
Upload
Manuals
Brands
Rotex Manuals
Heat Pump
RHYHBH/X08AA
Rotex RHYHBH/X08AA Manuals
Manuals and User Guides for Rotex RHYHBH/X08AA. We have
2
Rotex RHYHBH/X08AA manuals available for free PDF download: Installer's Reference Manual
Rotex RHYHBH/X08AA Installer's Reference Manual (122 pages)
HPU hybrid
Brand:
Rotex
| Category:
Heat Pump
| Size: 4 MB
Table of Contents
Table of Contents
2
1 About the Product
3
2 About the Documentation
4
About this Document
4
3 General Safety Precautions
4
Meaning of Warnings and Symbols
4
For the Installer
5
General
5
Installation Site
5
Refrigerant
5
Water
6
Electrical
6
Gas
6
Gas Exhaust
7
Local Legislation
7
4 About the Box
7
Outdoor Unit
7
To Unpack the Outdoor Unit
7
To Remove the Accessories from the Outdoor Unit
8
Indoor Unit
8
To Unpack the Indoor Unit
8
To Remove the Accessories from the Indoor Unit
8
Gas Boiler
9
To Unpack the Gas Boiler
9
To Remove the Accessories from the Gas Boiler
9
5 About the Units and Options
10
Identification
10
Identification Label: Outdoor Unit
10
Identification Label: Indoor Unit
10
Identification Label: Gas Boiler
10
Possible Combinations of Units and Options
11
List of Options for Outdoor Unit
11
List of Options for Indoor Unit
11
List of Options for Gas Boiler
12
Possible Combinations of Indoor Unit and Outdoor Unit
14
Possible Combinations of Indoor Unit and Domestic Hot Water Tank
14
6 Preparation
14
Preparing Installation Site
14
Installation Site Requirements of the Outdoor Unit
14
Additional Installation Site Requirements of the Outdoor Unit in Cold Climates
15
Installation Site Requirements of the Indoor Unit
15
Preparing Refrigerant Piping
15
Refrigerant Piping Insulation
15
Refrigerant Piping Requirements
16
Preparing Water Piping
16
Water Circuit Requirements
16
Formula to Calculate the Expansion Vessel Pre-Pressure
17
To Check the Water Volume
17
Changing the Pre-Pressure of the Expansion Vessel
18
To Check the Water Volume: Examples
18
Preparing Electrical Wiring
18
About Preparing Electrical Wiring
18
About Preferential Kwh Rate Power Supply
19
Overview of Electrical Connections Except External Actuators
19
Overview of Electrical Connections for External and Internal Actuators
20
7 Installation
20
Opening the Units
20
To Open the Outdoor Unit
20
To Open the Switch Box Cover of the Indoor Unit
20
To Open the Gas Boiler
21
To Open the Switch Box Cover of the Gas Boiler
21
Mounting the Outdoor Unit
21
To Prepare the Installation Structure
21
To Install the Outdoor Unit
22
To Prepare Drain Work
23
To Prevent the Outdoor Unit from Falling over
23
Mounting the Indoor Unit
24
To Install the Indoor Unit
24
Mounting the Gas Boiler
24
To Install the Gas Boiler
24
To Install the Condensate Trap
25
Condensate Pipe Work
26
Internal Connections
26
External Connections
26
Connecting the Refrigerant Piping
26
Condensate Pump
26
Pipe Bending Guidelines
27
To Braze the Pipe End
27
To Flare the Pipe End
27
To Connect the Refrigerant Piping to the Outdoor Unit
28
To Handle the Service Cap
28
To Handle the Stem Cap
28
To Handle the Stop Valve
28
To Open/Close the Stop Valve
28
About Checking the Refrigerant Piping
29
To Check for Leaks
29
To Connect the Refrigerant Piping to the Indoor Unit
29
To Perform Vacuum Drying
29
To Calculate the Complete Recharge Amount
30
To Charge Refrigerant
30
To Determine the Additional Refrigerant Amount
30
To Fix the Fluorinated Greenhouse Gases Label
30
Connecting the Water Piping
31
Connecting the Water Piping of the Indoor Unit
31
Connecting the Water Piping of the Gas Boiler
31
To Fill the Space Heating Circuit
32
To Fill the Domestic Water Circuit of the Gas Boiler
32
To Fill the Domestic Hot Water Tank
32
To Insulate the Water Piping
32
Connecting the Electrical Wiring
32
About Electrical Compliance
33
To Connect the Electrical Wiring on the Outdoor Unit
33
To Connect the Electrical Wiring on the Indoor Unit
33
To Connect the Electrical Wiring on the Indoor Unit
34
To Connect the Main Power Supply of the Indoor Unit
34
To Connect the Main Power Supply of the Gas Boiler
35
To Connect the Communication Cable between Gas Boiler and Indoor Unit
35
To Connect the User Interface
36
To Connect the Shut-Off Valve
37
To Connect the Electrical Meter
37
To Connect the Gas Meter
38
To Connect the Domestic Hot Water Pump
38
To Connect the Alarm Output
38
To Connect the Space Cooling/Heating ON/OFF Output
38
To Connect the Power Consumption Digital Inputs
39
Connecting the Gas Piping
39
To Connect the Gas Pipe
39
Connecting the Boiler to the Flue Gas System
39
Connection
39
To Change the 60/100 Concentric Connection to a Dual Pipe Connection
40
Calculate the Total Piping Length
40
Appliance Categories and Pipe Lengths
41
Applicable Materials
43
Flue Pipe Position
43
Insulation of the Gas Exhaust and Air Intake
44
Fitting a Horizontal Flue System
44
Fitting a Vertical Flue System
44
7.10.10 Plume Management Kit
44
7.10.11 Flues in Voids
44
Finishing the Outdoor Unit Installation
45
To Finish the Outdoor Unit Installation
45
To Close the Outdoor Unit
45
Finishing the Indoor Unit Installation
45
To Close the Indoor Unit
45
Finishing the Gas Boiler Installation
45
To Purge the Gas Supply
45
To Close the Gas Boiler
45
To Install the Cover Plate
46
8 Configuration
46
Indoor Unit
46
Overview: Configuration
46
Basic Configuration
48
Domestic Hot Water Control
56
Advanced Configuration/Optimization
57
System Settings
63
Menu Structure: Overview
65
Menu Structure: Overview Installer Settings
66
Gas Boiler
68
Overview: Configuration
68
Basic Configuration
68
Frost Protection Function
68
9 Operation
73
Overview: Operation
73
Heating
73
Domestic Hot Water
73
Flow Resistance Graph for Appliance Domestic Hot Water Circuit
73
Operation Modes
73
10 Commissioning
74
Overview: Commissioning
74
Checklist before Test Run
74
Air Purge Function
75
To Perform a Manual Air Purge
75
To Perform an Automatic Air Purge
75
To Interrupt Air Purge
75
To Perform a Test Run
75
To Perform an Actuator Test Run
76
Possible Actuator Test Runs
76
Underfloor Heating Screed Dryout
76
To Program an Underfloor Heating Screed Dryout Schedule
76
To Perform an Underfloor Heating Screed Dryout
77
To Readout the Status of an Underfloor Heating Screed Dryout
77
To Interrupt an Underfloor Heating Screed Dryout
77
To Perform an Air Purge on the Gas Supply
77
To Perform a Test Run on the Gas Boiler
77
11 Hand-Over to the User
78
12 Maintenance and Service
78
Maintenance Safety Precautions
78
Opening the Indoor Unit
78
Checklist for Yearly Maintenance of the Indoor Unit
78
To Disassemble the Gas Boiler
79
To Clean the Inside of the Gas Boiler
80
To Assemble the Gas Boiler
80
13 Troubleshooting
81
Overview: Troubleshooting
81
General Guidelines
81
Solving Problems Based on Symptoms
81
Symptom: the Unit Is NOT Heating or Cooling as Expected
81
Symptom: the Compressor Does NOT Start (Space Heating)
82
Symptom: the Pump Is Making Noise (Cavitation)
82
Symptom: the Pressure Relief Valve Opens
82
Symptom: the Water Pressure Relief Valve Leaks
82
Symptom: the Space Is NOT Sufficiently Heated at Low Outdoor Temperatures
83
Symptom: the Pressure at the Tapping Point Is Temporarily Unusual High
83
Symptom: Tank Disinfection Function Is NOT Completed Correctly (AH-Error)
83
Symptom: Boiler Abnormality Detection (HJ-11 Error)
83
Symptom: Boiler/Hydrobox Combination Abnormality
83
13.3.11 Symptom: the Burner Does NOT Ignite
83
13.3.12 Symptom: the Burner Ignites Noisily
84
13.3.13 Symptom: the Burner Resonates
84
Symptom: no Space Heating by the Gas Boiler
84
13.3.15 Symptom: the Power Is Reduced
84
Symptom: Space Heating Does NOT Reach the Temperature
84
Symptom: Hot Water Does NOT Reach the Temperature
84
Solving Problems Based on Error Codes
84
Error Codes: Overview
84
14 Disposal
86
To Pump down
86
To Start and Stop Forced Cooling
86
15 Glossary
87
16 Technical Data
88
Dimensions and Service Space
88
Dimensions and Service Space: Outdoor Unit
88
Dimensions and Service Space: Indoor Unit
89
Components
91
Components: Outdoor Unit
91
Components: Switch Box (Outdoor Unit)
91
Components: Indoor Unit
91
Components: Switch Box (Indoor Unit)
92
Components: Gas Boiler
93
Piping Diagram
94
Piping Diagram: Outdoor Unit
94
Piping Diagram: Indoor Unit
95
Wiring Diagram
96
Wiring Diagram: Outdoor Unit
96
Wiring Diagram: Indoor Unit
98
Wiring Diagram: Gas Boiler
101
Technical Specifications
102
Technical Specifications: Outdoor Unit
102
Technical Specifications: Indoor Unit
106
Technical Specifications: Gas Boiler
108
Operation Range
111
Operation Range: Heating and Cooling
111
ESP Curve
112
ESP Curve: Indoor Unit
112
17 Field Settings Table
113
Advertisement
Rotex RHYHBH/X08AA Installer's Reference Manual (124 pages)
ROTEX HPU hybrid
Brand:
Rotex
| Category:
Air Conditioner
| Size: 5 MB
Advertisement
Related Products
Rotex RHYHBH05AA
Rotex RHYHBH08AA
Rotex RHYHBX08AA
Rotex RKHBX016BB6V3
Rotex RKHB*016AB3V3
Rotex RRLQ006CAV3
Rotex RRRQ016AAY1
Rotex RRHQ008BAV3
Rotex RKHBRD016ADY17
Rotex RKHH2E260AAV33
Rotex Categories
Boiler
Heat Pump
Air Conditioner
Water Heater
Control Unit
More Rotex Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL